Kingspan Klargester BIODISC BN Installation & Operation Manual Download Page 15

018316-01 – Installation & Operation Guidelines for BN BioDisc 

Page 15 of 15 

11  Notice 

 
 
 
 
 
 
 
 

KINGSPAN BioDisc ® 

 
 
The foul drainage from this property discharges into a package treatment works. 
 
Maintenance is required, the frequency of which depends upon the model installed, its use 
and its application.  Please consult your owners pack. 
 

*

  BN BioDisc requires routine maintenance and Desludging at 3 month 

 intervals. 

 
Maintenance  and  Desludging  should  be  carried  out  by  the  owner in  accordance  with  the 
Manufactures instructions. 
 
THE OWNER OF THE PROPERTY IS LEGALLY RESPONSIBLE FOR ENSURING THAT 
THE SYSTEM DOES NOT CAUSE POLLUTION, A HEALTH HAZARD OR A NUISANCE. 
 
We  recommend  that  a  separate log is  kept  of  all  maintenance  and  service  visits,  the log 
should detail the date and any action taken, e.g. Regular maintenance service, breakdown 
visit, desludge volume removed, parts replaced. 
 
This  notice  should  be  fixed  by  the  owner  within  the  building  alerting  current  and  future 
owners to the maintenance requirement. (Building regulation H2 (1.57) 
 
Please contact Kingspan Environmental Services on +44 (0) 844 846 0500, to arrange a 
maintenance service or to request replacement operating instructions. It would be helpful if 
you provide your equipment serial number. 
 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Klargester BIODISC BN

Page 1: ...ust 2017 018316 INSTALLATION OPERATION GUIDELINES FOR SINGLE PIECE UNITS BIODISC BN Kingspan Environmental Service Contact Numbers GB 0844 846 0500 NI 028 3025 4077 IRL 048 3025 4077 DS1334 BN BioDisc...

Page 2: ...equipment Kingspan offer a range of maintenance contracts details on request Should you wish to inspect the operation of the equipment please observe all necessary precautions including those listed...

Page 3: ...ing a Kingspan product This manual will help you to keep it operating efficiently over a long service life Please read this manual thoroughly preferably before installation This manual should be refer...

Page 4: ...FED THREE PIECE SYSTEM PST INLET INVERT OPTIONS 600mm 1100mm 1500mm BIODISC BIODISC PUMP STATION H H K F F E G J D D STANDARD SINGLE PIECE SYSTEM G L G L G Note Illustrations are schematic Refer to G...

Page 5: ...5500 5650 Standard Power Supply 400V 3 Phase Motor Rating 1 Phase Watts 2 x 370 Full Load Current 3 Phase Amps 2 x 1 35 Sludge Return Pump Rating Watts 480 Pump Station Diameter J mm 900 Flange Height...

Page 6: ...essential to maintain permeability 4 1 6 The BioDisc system must be installed at a level which will allow connection to the incoming drain and a free discharge at the system outlet Effluent pumping st...

Page 7: ...mly supported so that point loads through the unit are avoided 5 1 5 Refer to the drawings attached for dimensions of units 5 1 6 The Concrete Specification is not a site specific installation design...

Page 8: ...unit 250 500mm above the concrete backfill level but do not attempt to fill the unit with water above the outlet level 5 2 12 Remove blanking cap from the cable duct at the outlet end of the unit 5 2...

Page 9: ...Automatic grease cartridges 6 2 1 The shaft roller bearings are fitted with pressurised grease cartridges These should be activated before the unit is started 6 2 2 Turn the control knob and it s link...

Page 10: ...tant that you are aware of the following points 7 1 2 Your BioDisc system uses colonies of live natural micro organisms biomass to break down the pollutants in the sewage Many chemicals used in househ...

Page 11: ...ble peelings etc its cheaper and environmentally friendly 7 2 5 Home beer and wine making This presents a similar problem to waste disposal units The BioDisc has to work as hard to treat one pint of b...

Page 12: ...any aspects of concern to your maintenance engineer 8 3 1 2 Check the appearance of the Biomass It should be light grey to grey at both first banks gradually changing to brown in both second stages a...

Page 13: ...er points B and C may be removed for access if required 9 2 6 Note While de sludging ensure that there is never more than 250mm difference in water levels between points A and C 9 2 7 DO NOT attempt t...

Page 14: ...ty to inspect the goods so as to confirm that they are defective c the goods not having been modified mishandled or misused and being used strictly in accordance with any relevant instructions issued...

Page 15: ...ER OF THE PROPERTY IS LEGALLY RESPONSIBLE FOR ENSURING THAT THE SYSTEM DOES NOT CAUSE POLLUTION A HEALTH HAZARD OR A NUISANCE We recommend that a separate log is kept of all maintenance and service vi...

Reviews: