017904-04 BioFicient 4-6 Installation Manual
6
Solenoid Valve
BioFicient® CHECKLIST
The delivery paperwork will have 2 no. items listed; check that the Tank Code (Item 1) & Blower Assembly Code (Item 2) are the
same as the codes on the units delivered.
Example;
Top Level Product Code – BFGAG050K
Item 1 – BFPTANK4GO50K (Tank Code)
Item 2 - BHBF4GOK (Blower Assembly Code)
Sewage Treatment Tank
Item 1
NB: Storage tanks vary in design and volume (15PE to 30PE). Please check your
order and cross reference with relevant sales drawing.
Blower Housing Assembly
Item 2 The Blower Assembly consists of the Blower Unit, Control Panel or
Isolator, and associated pipework and fittings.
13 mm Hose Coil – 15 Meters
13 mm Hose required to connect from 1/2” Hose Connector in Blower Housing to
Sludge-return Pipework located with the Tank (Supplied inside Blower Housing
Packaging).
19 mm Hose Coil - 15 Meters
19 mm Hose required to connect from 3/4” Hose Connector in Blower Housing to Air
Diffuser Manifold located with the Tank (Supplied inside Blower Housing Packaging).
or