At this point the unit should be anchored to the ground. See anchoring instructions on page 9.

5/16”x2”

5/16”x2”

Insert Second

Step A

First connect pipes “A” & “A” and bolt them together with a 5/16” x 2 1/2” bolt. Place them next to each 3 & 4 

way connector. Pick up one side of the unit by the bottom portion of the 4 way fitting. Lift one side and insert 

the connected (“A” & “A”) pipe, making sure the wing nut faces towards the inside of canopy. Insert the centre 

legs first and work outward. Repeat this step evenly until one side has all legs inserted. Repeat for the opposite 

side. At this point lift each leg and insert the metal foot pad.

NOTE:  The foot pads are NOT for anchoring the canopy!

Finish attaching the rest of the ball bungees to the frame and cover.

LEG ASSEMBLY

Step B

Next locate the horizontal pocket that runs the length of the unit. Slide pipe “C” & “D” into the pocket, section 

by section. Attach by using the 3 way and 4 way clamps for the center legs. Use the 8 x 63.5mm bolt to secure 

the clamps. (Be sure the flat portion of the bolt is flush against the cover) Be sure the cover is snug before 

tightening the bar and clamps.

A

A

Insert First

REUSE

REDUCE

RECYCLE

2.6 m 

8 f

t. 9 in.

4.1 m 

13 ft. 7 in.

7.3 m 

24 f

t.

5/16”x2 1/2”

Summary of Contents for StorGuard SG1324S

Page 1: ... Side Walls 2 End Walls Rafter Cables Elastic Ball Straps Foot Pads and Anchors WARNING Keep all flame and heat sources away from this tent fabric The fabric will burn if left in continuous contact with any flame source Distributed by PIC America LTD 1730 Five Points Lane Fuquay Varina NC 27526 1 800 800 6296 www kingcanopy com REUSEREDUCERECYCLE These Tools Are Recommended PLEASE READ THE INSTRUC...

Page 2: ...2GV 6 pc 4 way Connectors Sides 4W215GV 3 pc 4 way Connectors Peak SC215 GV 4 pc 3 way Clamp DC215 GV 6 pc 4 way Clamp 14 pc 5 16 x 2 1 2 Bolts 16 pc 5 16 x 2 Clamp Bolts 2 pc 5 16 x 1 1 2 Bolts 42 pc 5 16 Nuts Washers BALL 75 pc Elastic Ball Straps SGC1324S 1 pc Fitted 1 Piece Silver Cover SG13SEW 2 pc Silver End Walls with Grommets FOOT2GV 10 pc Slanted Foot Pads A15 CC 10 pc Anchors with Cable ...

Page 3: ...REUSEREDUCERECYCLE FRAME DIAGRAM 2 6 m 8 ft 9 in 4 1 m 1 3 f t 7 in 7 3 m 2 4 f t ...

Page 4: ...ze and shape Arrange per the illustration below ROOF FRAME ASSEMBLY C C C C C C C C C D D D D D D D D D B B B B B B B B A A A A A A A A C C C D D D B B A A Right Corner 3 Way Left Corner 3 Way Left Corner 3 Way Right Corner 3 Way R R L L REUSEREDUCERECYCLE E F E F Centre ...

Page 5: ... cover Once the centre frame work is fully connected assemble the left and right sections Connect Pipe A B together align and connect the pipe to the appropriate 3 4 way fittings At this time finish installing the Woven Cable system by slipping the end of the longer cable over the 3 4 way fittings on the left and right sections and through the short cable hanging from the centre fit tings See Figu...

Page 6: ...g the ball bungees or legs Attach ball bungees along the perimeter of each end holding the cover in place Wait to attach the left and right side until the legs have been installed Note You may want to fold the sidewall section back over the roof frame to keep it out of the way and off the ground until you attach the legs The side walls are long enough to be buried in the ground to prevent water fr...

Page 7: ...e side has all legs inserted Repeat for the opposite side At this point lift each leg and insert the metal foot pad NOTE The foot pads are NOT for anchoring the canopy Finish attaching the rest of the ball bungees to the frame and cover LEG ASSEMBLY Step B Next locate the horizontal pocket that runs the length of the unit Slide pipe C D into the pocket section by section Attach by using the 3 way ...

Page 8: ...nd wall facing out Bolt and secure the support bar HOW TO SECURE THE END WALLS Both left and right side of each end wall has a run of grommets C Attach an S hook to each grommet and squeeze the attached end of the S hook with pliers so it does not fall out of the grommet D Next loop a ball bungee through each grommet hole of the end wall see diagram on the right E After all four sides are complete...

Page 9: ...anchor into ground next to canopy foot using a large screw driver 1 Looping the cable through the anchor eye will keep it out of the way while turning Tilting the anchor slightly will help the anchor to cut into the ground Apply downward pressure while turning the anchor into the ground Leave approximately 8 cm 3 in of anchor out of the ground Slide the clamp onto cable 2 Run cable around the pipe...

Page 10: ...s truss system or ball straps of the unit REMOVE canopy cover before a storm or disassemble entire canopy unit if possible REMOVE rain water snow and ice from canopy cover This is a temporary structure and is not recommended for use as a permanent structure The King Canopy StorGuard Garages are designed to be one of the strongest and most well designed garages in production today This innovative p...

Page 11: ...ages cause by sun light rain tree sap birds etc They are not designed to hold roof loads that accompany snow ice or heavy rains If your canopy is not anchored securely strong winds can lift it and cause damage if it is blown over and or away Canopies make excellent kites If your canopy is anchored incorrectly and is blown away we will not send any free replacement parts for damages If you know str...