Kimberley KSV200 Installation Instructions Download Page 2

SOLAR

 

ROOF VENTILATOR

INSTALLATION INSTRUCTIONS - METAL ROOF

MODEL KSV200

Before you begin

Tools Required:

Drill
6mm drill bit
Grinder with diamond wheel
Silicone gun
4x 50mm screws

Before beginning the installation of your new solar powered roof ventilator, please read the instructions carefully and contact us if you have 
any questions. [email protected] or Ph: (03) 9768 5777

For optimum performance, position the solar ventilator in a north facing position on an area of the roof where it is not shaded or blocked. 
This will ensure the solar device can capture all available sunlight throughout the day.

For your safety we recommend that you always use appropriate safety equipment when working on your roof. Ask for assistance whenever 
attempting any heavy lifting.

Use a tape measure to mark cut-out area on  your roof.
(350mm x 350mm Recommended for KSV200 Model).

INSTALLATION TO A METAL DECK ROOF

1

2

3

SEE OVER FOR TILED ROOF INSTALLATION

Remove any existing fasteners from the marked vicinity. 
The unit flashing will install under the ridge-cap -so remove any 
fasteners above your desired location.

Cut marked cavity to desired size leaving battens intact.

Depending on the distance between your battens, a secondary 
batten may need to be introduced to offer additional support for 
the ventilator unit.

Identify the turn-up fold in the metal flashing on one edge of the 
Solar Ventilator unit. This is the bottom. The unit should be posi-
tioned with this fold at the lowest point of your desired location.

Place unit over your cut-out ensuring the turn-up fold is at the 
bottom. Slide top unit flashing up underneath your ridge-cap. If 
necessary, mark drill holes on flashing to allow return of original 
ridge-cap fasteners. Also mark desired holes to secure into roof 
battens below.  

Once ready to fit, return unit under ridge cap to desired position 
-secure fasteners (or same type) back in place and into battens.
Use silicon around exposed edges to seal.

Depending on your setup, you may need to alter the unit flashing 
in order to return your ridge cap to it's original flush position 
(During step 3 installation - read first). You may need to cut/grind 
up to 50mm away from the folded outer edge on the vertical left 
and right hand side, at the TOP of the ventilator flashing. The 
cut-away amount will vary for different ridge-caps but you ideally 
cut just enough to ensure you can slide the unit underneath and 
out of the weather, while remaining flush to the metal deck roofing.

kimprod.com.au

SRV-160817

Reviews: