Kikusui LP01-TOS Operation Manual Download Page 6

6

LP01/02-TOS

Test Procedure

If the LP02-TOS is used more than 30 A, the contact pin will be
high temperatures. Never touch the contact pin immediately test-
ing is completed. Touching will result in getting burned. 

Be  sure  to  connect  the  contact  pin  and  the  alligator  clip  to  the
DUT. If the contact pin is removed or the clip is disconnected from
the DUT during testing, result in sparking and potentially damag-
ing the DUT.

Configure the required test conditions for the Tester by referring to the opera-
tion manual.

To obtain secure identification of FAIL judgment, turning on the FAIL MODE of
the Tester is recommended.

Connect the test probe to the Tester according to the “Connecting to the Tes

-

ter” item.

1.

Connect the alligator clip of the LOW test lead to the protective conductor 
terminal of the DUT.

2.

Apply the contact pin of the test probe to the test point of the DUT.

3.

Depress the START switch.
This causes the OUTPUT LED to light up; the test current flows from the con-
tact pin.
Do not remove the contact pin from the DUT during testing.

4.

When testing is complete, lift your finger from the START switch.
Do not remove the contact pin from the DUT.

5.

Confirm that the OUTPUT LED is not lit.

6.

Remove the test probe from the DUT.

7.

Disconnect the alligator clip of the LOW test lead from the DUT.

After completing all tests, turn off the POWER switch of the Tester.

WARNING

CAUTION

Testing from the protec-
tive conductor terminal 
on the enclosure.

To stop testing, release your 
finger from the START switch.

1. To the protective conductor terminal

2. To the test point

3. Depress the START    

switch.

    The OUTPUT LED 

lights up.

DUT

Summary of Contents for LP01-TOS

Page 1: ...r earth continuity testers The test probe is designed specifically for use with a KIKUSUI Earth Continu ity Tester It cannot be used with other earth continuity testers even if the connector appears t...

Page 2: ...from the switch will stop testing Contact Pin Test current is delivered to this pin contacting a test point of the DUT Holder This part holds the contact pin OUTPUT LED This red LED indicates that te...

Page 3: ...epairs Test probe cable and LOW test lead Check for broken sheathing and loose or cracked connectors Confirm electrical continuity Start switch Confirm that the switch operates smoothly when pressed C...

Page 4: ...OUTPUT LED does not light The on off status of the OUTPUT LED of the test probe is inconsistent with that of the TEST LED on the Tester The OUTPUT LED remains lit even when you release your finger fr...

Page 5: ...e LOW terminal of the Tester 4 Connect the each cable of the test probe to the HIGH and REMOTE termi nal of the Tester Connecting the remote control cable starts or stops testing as indicated below Te...

Page 6: ...nect the alligator clip of the LOW test lead to the protective conductor terminal of the DUT 2 Apply the contact pin of the test probe to the test point of the DUT 3 Depress the START switch This caus...

Page 7: ...i distributor or agent Specifications 1 The rated maximum voltage current refers to the maximum voltage current the test probe is capable of handling within the given operating temperature and humidit...

Page 8: ...e equipment and quantity SJ T 11364 GB T 26572 GB T 26572 Environment friendly Use Period Pb Hg Cd Cr VI PBB PBDE LP01 TOS LP02 TOS KIKUSUI ELECTRONICS CORP www kikusui co jp en 1 1 3 Higashiyamata Ts...

Reviews: