![Kikusui BIM1000 Series User Manual Download Page 73](http://html.mh-extra.com/html/kikusui/bim1000-series/bim1000-series_user-manual_1966754073.webp)
BIM1000 Series
User’s Manual
73
Remote Control | Message Reference
Retrieving the most recent measured value
Queries the most recent measured value.
Example of retrieving measured values using :FETCh?
is set to ON and :TRIGger:SOURce
is set to EXTernal, when you
send “*TRG” or SIGNAL I/O TRIG-IN signal or press SNGL TRG on the front panel, the product makes a
single measurement. When you send :FETCh?, the measured value is read.
Executing a measurement and retrieving the measured value
When continuous measurement (:INITiate:CONTinuous) is off, a query for the measured value is made
after executing a measurement once.
When the trigger source (:TRIGger:SOURce) is set to EXT, a measurement is not executed by this com-
mand alone. To execute a measurement, use SNGL TRG on the front panel or the SIGNAL I/O TRIG-IN
signal (a measurement cannot be performed using *TRG).
Example of retrieving measured values using :READ?
is set to OFF and :TRIGger:SOURce
is set to INTernal, sending
:READ? causes the measured value to be read after a measurement is made.
If :INITiate:CONTinuous
is set to OFF and :TRIGger:SOURce
is set to EXTernal, sending
:READ? causes the product to switch to a trigger wait state. If you send a SIGNAL I/O TRIG-IN signal, the
product makes a single measurement, and the measured value is read.
Program header
:FETCh?
Response
Any of the following responses will be returned depending on the :DATA:FORMat
setting.
Resistance only: <Resistance measurement (NR3)>
Voltage only: <Voltage measurement (NR3)>
Resistance and voltage: <Resistance measurement (NR3)>,<Voltage measurement
(NR3)>
Unit
Ω, V
Note
When the measurement overflows, “+1.00000+E08” is returned. When a measurement
error occurs, “+1.00000+E09” is returned.
Program header
:READ?
Response
Any of the following responses will be returned depending on the :DATA:FORMat
setting.
Resistance only: <Resistance measurement (NR3)>
Voltage only: <Voltage measurement (NR3)>
Resistance and voltage: <Resistance measurement (NR3)>,<Voltage measurement
(NR3)>
Unit
Ω, V
Note
When continuous measurement (:INITiate:CONTinuous) is on, an execution error
occurs.
The next command is not executed until the measurement is completed.
To execute this command after changing the measurement conditions, insert an interval
of 100 ms.
When the measurement overflows, “+1.00000+E08” is returned. When a measurement
error occurs, “+1.00000+E09” is returned.
Summary of Contents for BIM1000 Series
Page 93: ......