51
0318
1367
10-1/2” In Ground
S3
per
ground
stake
Step 28: Attach Ground Stakes
A:
Drive 2 (0318) Ground Stakes 10-1/2” into the ground, 1 at (1367) Post MK and 1 at (1931) Post, as shown in
fig. 28.1, and attach with 2 (S3) #8 x 2-1/2” Wood Screws per ground stake. (fig. 28.2)
Warning! To prevent tipping and avoid potential injury,
stakes must be driven 10-1/2” into ground. Digging or
driving stakes can be dangerous if you do not check
first for underground wiring, cables or gas lines.
Wood Parts
Hardware
Fig. 28.2
4 x
#8 x 2-1/2” Wood Screw
2 x
Ground Stake 1-1/4 x 1-1/2 x 14”
0318
S3
Pg 50 image update,
crop as needed
Pg 51 image update
Fig. 28.1
1931
1367