
16
1 x
Panel Assembly
021
Wood Parts
Hardware
Step 2: Frame Assembly
Part 1
12 x
#8 x 2-1/2” Wood Screw
S3
021
021
S3
S3
S3
x 6 per
side
Front Wall
Back Wall
x 6 per
side
A:
Place (021) Panel Assembly in the upright position and unfold all panels, making sure that the window openings
are at the top.
B:
Check to make sure that the assembly is square then install 6 (S3) #8 x 2-1/2” Wood Screws in the Front Wall
and Back Wall panels. (fig.2.1, 2.2)
Fig. 2.1
Fig. 2.2
Summary of Contents for Cedar Summit Timber Trail Playhouse
Page 71: ...71 NOTES...