E-1
August 1999
76-100016-001
Intelligent Suppression Control/Fire Alarm System
PEGAsys
APPENDIX E
FACTORY MUTUAL SPRINKLER REQUIREMENTS
FOR
PRE-ACTION AND DELUGE TYPE SPRINKLER SYSTEMS
E-1
GENERAL INFORMATION
PEGAsys
system installation applications which require Fac-
tory Mutual (FM) approval of pre-action and deluge sprinkler
systems must conform to the following guidelines.
•
SmartOne™ Thermal Detectors, Model THD-7252, when
used must be installed at 20 Ft. spacings. The pre-alarm
and alarm setpoint ranges are as follows:
Pre-alarm
80 to 155 deg F
Alarm
135 to 155 deg F
•
Initiating Circuits (RX/TX - PC line) must be configured for
Style 6 wiring. Refer to Drawing No. 06-235443-002 for com-
plete RX/TX PC line wiring instructions.
•
Provide 90 hours of standby battery and 10 minutes of alarm
operation. Refer to Appendix A.
•
Agent release output can be CCM output MP1 or I/O mod-
ule agent release module AR1 - AR8. Each output would
be required to be configured for solenoid activation. The
solenoid output-on time period would need to be set to ei-
ther “90 seconds” or “on until reset” using the PCS pro-
gram.
Summary of Contents for PEGAsys
Page 2: ......
Page 4: ......
Page 6: ...ii THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 16: ......
Page 155: ......