
Installation Note N9020-90257
17
Option BBA, Analog Baseband I/Q Inputs Retrofit Kit
Top Brace
Replacement
1.
. To replace the top brace
(1)
, place the brace into the correct position and
attach the appropriate screws included in the kit. There is an additional screw provided in this
kit (
)
(5)
to attach the top brace to the BBIQ Main board. Torque to 9 inch-pounds.
Figure 11
Top Brace Replacement