7-74 Keysight N5227B Service Guide
Repair and Replacement Procedures
Post-Repair Procedures
7-
Post-Repair Procedures
After the replacement of an assembly, you must perform the service
procedures in the order listed in
.
Procedures referenced in this table are located in
unless specified otherwise.
to review where the
calibration stickers should be placed on the PNA.
Table 7-2
Related Service Procedures
Replaced Assembly
Adjustments
and Other Procedures
Verification, Performance,
and Other Tests and Procedures
A1 front panel interface board
No adjustment needed
Front Panel Keypad and RPG Test
and
A2 USB board
No adjustment needed
Check for proper operation
A3 display assembly
A4 13.5 GHz source 1 synthesizer
board
: Synth Src1
only
Synthesizer Bandwidth
Adjustment
a
S93900/1/2/4/5/7A/B Installed)
A5 26.5 GHz source board
S93900/1/2/4/5/7A/B Installed)