
20
Keysight M9521A AXIe System Module Startup Guide
Step 5: Set Up the Host PC
In brief, the host PC must be off whenever the chassis is powered up or down.
Because modules are not hot-swappable, the chassis must be powered down
before modules are added or removed.
While the power sequencing shown above does not apply to an embedded
controller (because an embedded controller and chassis are powered
simultaneously), an embedded controller must also be restarted (after Windows
starts) if the chassis configuration was changed in any way while the chassis and
embedded controller were powered on.
Summary of Contents for M9521A
Page 1: ...Keysight M9521A AXIe System Module ASM Startup Guide...
Page 2: ......
Page 6: ...vi...
Page 8: ...viii Keysight M9521A AXIe System Module Startup Guide...
Page 31: ...Keysight M9521A AXIe System Module Startup Guide 31 Host PC Chassis Interface Topics...
Page 36: ...36 Keysight M9521A AXIe System Module Startup Guide Safety Related Specifications...
Page 37: ...37...