278
Keysight N5990A MIPI M-PHY Receiver Test User Guide
8
Sys Burst Tests
Test 2.3.4-SYS-RX Differential Termination Enable Time (T
TERM-ON-SYS-RX
)
It is available for all hardware configurations in Termination mode.
Purpose
This test verifies that the SYS-RX enables the termination with in the
required time.
Procedure
The data generator sends Burst-mode SYS CJTPAT signaling with nominal
amplitude settings while the DUT is configured for Terminated-mode.
Then, the T
TERM-ON-SYS-RX
(PWM-RX differential termination enable time)
is measured using a real-time oscilloscope. Among all measured
T
TERM-ON-SYS-RX
values, the maximum and minimum T
TERM-ON-SYS-RX
values are considered as the final results.
The test will pass if the maximum T
TERM-ONSYSM-RX
value is less than the
PREPARE time defined by the DUT´s LS_PREPARE_Length_Capability
attribute (see
This test is performed at each selected lane.
Connection Diagram
Refer to the connection diagrams shown in the Connection Diagram
section of the Test 2.1.4-HS-RX Differential Termination Enable Time test.
Parameters
The parameters used in
Expert Mode
for this test, are as follows:
• CDR Loop Bandwidth (if CDR is selected in the Special Parameter
dialog, see
)
• CDR Peaking (if CDR is selected in the Special Parameter dialog, see
• CDR Transition Density (if CDR is selected in the Special Parameter
dialog, see
)
• CDR Loop Order (if CDR is selected in the Special Parameter dialog,
see
• Semi Automated Test
• Set Single Ended Amplitude
• Set Offset
Summary of Contents for N5990A
Page 1: ...User Guide Keysight N5990A MIPI M PHY Receiver Test...
Page 62: ......
Page 86: ...86 Keysight N5990A MIPI M PHY Receiver Test User Guide 4 Calibrations...
Page 88: ...88 Keysight N5990A MIPI M PHY Receiver Test User Guide 4 Calibrations...
Page 214: ......
Page 234: ......
Page 268: ......
Page 298: ......