24 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Step 19.Install the LED Boards and Test Port Coupler Assemblies to
the Test Set Front Plate
1. Remove two screws from each LED board and remove the boards from the
2-port test set front plate of the PNA.
2. Remove the 2-port test set front plate from the test set deck.
3. Follow the instructions shown in
.
Figure 7
LED Board Assemblies and Test Port Coupler Assemblies Installation