
3-8 Keysight N5290/1A Service Guide
System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
3-
N5290/1A Incoming Electrical Inspection
In this section the manual receiver display test is ran to check the general
system integrity.
Figure 3-2
PNA RF Port Connector to N5292A Test Set Lo Band Connector (2.4 mm)
This section contains the following:
—
“Initializing the N5290/1A Broadband System” on page 3-9
—
“Running the Installation Calibration” on page 3-9
IMPORTANT!
For N5224/5B, N5244/5B, and N5267B PNAs When
connecting the 5292-20014 semirigid cable it is critical that the 2.4 mm
end is connected to the PNA’s REF
n
SOURCE OUT port and the SMA end is
connected to the N5292A test set’s LO Band connector. Refer to
If the N5290/1A system is already installed and no changes have occurred
to any of the instruments or cables, refer to
/ Head Cable Checks.
If a cable has been changed or disconnected reconnected or similar
“Running the Installation Calibration” on page 3-9
EXCEPTION
: If you swapped in a new head or swapped heads on the ports,
“The N5290/1A Millimeter Test System Preliminary Check” on
.
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...