e300i User Manual
Document #: 0503M01A
REV : 1.3
Approval:
Date: March ’08
Page 6 of 25
3
3
U
U
n
n
p
p
a
a
c
c
k
k
i
i
n
n
g
g
a
a
n
n
d
d
T
T
u
u
r
r
b
b
i
i
n
n
e
e
A
A
s
s
s
s
e
e
m
m
b
b
l
l
y
y
3
3
.
.
1
1
C
C
o
o
m
m
p
p
o
o
n
n
e
e
n
n
t
t
s
s
S
S
u
u
p
p
p
p
l
l
i
i
e
e
d
d
3
3
.
.
2
2
T
T
o
o
o
o
l
l
s
s
R
R
e
e
q
q
u
u
i
i
r
r
e
e
d
d
3
3
.
.
3
3
U
U
n
n
p
p
a
a
c
c
k
k
i
i
n
n
g
g
3
3
.
.
4
4
T
T
e
e
c
c
h
h
n
n
i
i
c
c
a
a
l
l
R
R
e
e
q
q
u
u
i
i
r
r
e
e
m
m
e
e
n
n
t
t
s
s
f
f
o
o
r
r
A
A
s
s
s
s
e
e
m
m
b
b
l
l
y
y
3
3
.
.
5
5
G
G
e
e
n
n
e
e
r
r
a
a
t
t
o
o
r
r
A
A
s
s
s
s
e
e
m
m
b
b
l
l
y
y
3
3
.
.
6
6
T
T
a
a
i
i
l
l
A
A
s
s
s
s
e
e
m
m
b
b
l
l
y
y
3
3
.
.
7
7
F
F
i
i
t
t
t
t
i
i
n
n
g
g
t
t
h
h
e
e
P
P
i
i
t
t
c
c
h
h
C
C
o
o
n
n
t
t
r
r
o
o
l
l
3
3
.
.
8
8
B
B
l
l
a
a
d
d
e
e
A
A
s
s
s
s
e
e
m
m
b
b
l
l
y
y
3 UNPACKING AND TURBINE ASSEMBLY
3 UNPACKING AND TURBINE ASSEMBLY
3 UNPACKING AND TURBINE ASSEMBLY
3 UNPACKING AND TURBINE ASSEMBLY
3.1 Com
3.1 Com
3.1 Com
3.1 Components Supplied
ponents Supplied
ponents Supplied
ponents Supplied
The following components are supplied.
Pitch hub assembly
Shaft drive key
Propeller blade set
Generator assembly
Tail boom (two pieces)
Tail (two pieces)
Tail Stabiliser (two pieces)
Nacelle cover
Nosecone
All fasteners and bolts
Assembly grease
Locktite
3.
3.
3.
3.2
2
2
2 Tools Required
Tools Required
Tools Required
Tools Required
The following hand tools are required for turbine assembly and installation.
10mm metric ring spanner or socket wrench (two required)
13mm metric ring spanner or socket wrench
19mm metric ring spanner or socket wrench (two required)
Small size electrical screwdriver
Medium size electrical screwdriver
10mm Allen key wrench
Wire strippers for electrical connections
Tape measure to adjust the blades
Torque wrench
6