Installation
32 /72
2017/11
010-657
3
Installation
3.1
General information
The chamber elements are put together in accordance with Fig. [1]. Please heed the following:
– The excavation pit must have been prepared.
– Check chamber depth. Make sure that the assembled chamber elements correspond to the depth of the
excavation pit.
– Keep chamber elements and sealing gaskets free of soiling.
– The chamber elements must be assembled from the bottom up.
– The chamber system has been designed for a maximum of 0.5 m water pressure. -