6
Installation and assembly tips
1
2
3
4
5
6
7
1
Yard/gutter drain body DN 100
Sludge bucket
Support frame with grating
Upper section
Extension section
Extension section with horizontal
inlet
Odour trap
Before carrying out the asphalting work, place
a temporary cover on the drain to protect it
during the construction work.
1
2
1
2
Vertical height adjustment, adjusta-
ble up to 110 mm.
Turn the upper section of
the odour trap to the left and
remove it.
Loosen the bottom section of the
odour trap by tilting it and then
remove the trap.
Upper section can be rotated to
adjust to the tiling pattern.
Clear cross-section for pipe cleaning
The upper section can be tilted
by up to 5°, without impairing its
tightness.
Coat the seal with lubricant
and push the bottom section of
the odour trap downwards into the
seal seat.
Insert the top section of the
odour trap and lock by turning it to
the right.
Upper section (rotatable, tiltable, height-adjustable)
Cleaning the floor, yard and gutter drain
L
Please note: If the odour trap is installed in a deep position, it is possible that it can only be removed with
tools (see note on the previous page).
Concrete
paving
Asphalt
Clean layer