![Kerotest MODEL-1 Operation Manual Download Page 17](http://html1.mh-extra.com/html/kerotest/model-1/model-1_operation-manual_1957553017.webp)
TITLE:
NO.:
KEROTEST MODEL-1
REV.: 10
GATE VALVE
DATE: 7/12/07
OPERATIONS MANUAL
PAGE: 17 OF 35
This report is the property of Kerotest Manufacturing Corp. 5500 Second Avenue, Pittsburgh, PA 15207 and may not be
copied by any means without the expressed written consent of Kerotest. It is intended for the sole purpose of helping
Kerotest customers evaluate Kerotest products and may not be released to any third party or otherwise used in any
manner injurious to the interests of Kerotest
.
ZERO PRESSURE REPACKING PROCEDURE – EARLY DESIGN (BEFORE 1988)
CONDITION 3 – VALVE UNDER ZERO PRESSURE
(REFER TO DRAWING ON PAGE 18)
1.
Close valve tightly with wrench.
2.
Remove nut (1) and operating square (2).
3.
Remove all cap screws (3) and gland (4). (Upper thrust washer (6) may remain in gland
(4) or on stem (10).)
4.
Rotate stem (10) in same direction as closing the valve until it is free from the wedge.
Withdraw stem from valve. (Lower thrust washer (12) may remain in the cover or on the
stem (10).)
5.
Remove top packing adapter (7), v-rings (8), and lower packing adapter (9).
6.
Replace lower thrust washer (12) in cover if removed.
7.
Lubricate new parts with light oil and insert in packing chamber as follows: Lower
packing adapter (9), v-rings (8), and top packing adapter (7).
8.
Insert stem (10) in cover and rotate slowly by hand in the direction for opening valve.
Continue rotation until stem shoulder (11) contact lower thrust washer (12).
9.
Check if upper thrust washer (6) is in place. Position gasket (5) and gland (4) on cover.
Insert cap screws (3) fully and tighten. Place operating square (2) on stem and then
secure with nut (1).
Valve is ready for service.