background image

 

   

 

YPS-03-IA-e-1910 

 

rubbers

 

 

 

Figure 4 

Assembled inner frame 

 
 

 

Summary of Contents for TYPS-03A-B

Page 1: ...lei 1 D 72336 Balingen E Mail info kern sohn com Phone 49 0 7433 9933 0 Fax 49 0 7433 9933 149 Internet www kern sohn com Installation Instructions Balance table KERN TYPS 03A B Version 1 0 2020 08 GB TYPS 03A B IA e 2010 ...

Page 2: ...A B Version 1 0 2020 08 Installation Instructions Balance table Contents 1 Introduction 3 2 Technical data 3 3 Assembly of the weighing table 4 3 1 Inner frame assembly 4 3 2 Outer frame assembly 8 3 3 Final assembly 10 4 Attendance 10 ...

Page 3: ...cks The table comprises two different components An integrated work space with shock absorbing rubber blocks attached to a stone slab An external work table with aluminium profile frame and height adjustable feet 2 Technical data KERN YPS 03 Item no Type TYPS 03A B Total dimensions B x D x H 800 x 600 x 785 mm adjustable height Dimensions stone slab 300 x 400 x 80 mm Weight stone slab 24 kg Total ...

Page 4: ...e rail lefthand 1x granite supporting rail below 2x granite supporting rails short Accessory Bag Lower packing Middle packing Top packing Figure 1 Inner frame packing 2 Remove the two granite supporting rails long the 2 granite supporting rails short and the accessory bag from the lower packing layer 3 Screw these parts together with the 4x M8x40 screws using the hexagon wrench key from the bag in...

Page 5: ...ls into the frames After that tighten the 6 screws as shown in fig 3 After that the two sides should be aligned in a parallel and straight manner 6 Fix the four rubber blocks as shown in fig 4 7 Put upon the granite block and center it as exactly as possible Fig 5 and 6 show the completely assembled inner table 1 x Inner side rails left 1 x Granite support rails 1 x Inner side rails right 1 x Supp...

Page 6: ...6 YPS 03 IA e 1910 4 rubbers Figure 4 Assembled inner frame ...

Page 7: ...YPS 03 IA e 1910 7 Figure 5 Correct position of the granite Figure 6 Assembled inner frame with granite ...

Page 8: ...40 screws 4 Remove the outer table supporting rail lower from the top packing and fix it with two M8 x 40 screws You can open the 2 side frames a little in order to put the rails inside the frames and then 5 tighten the 10 screws as Figure 8 shows 6 Make sure the 2 sides are all parallel after the screws are tight You can see the assembled view in Figure 9 1x outer side rail righthand 1x working s...

Page 9: ... rail left 1x Table top assembly 1 x Outer side rail right 10x M8 x 40 socket screws 1 x Outer table supporting rail upper front 1x Outer table supporting rail lower Figure 8 Outer frame assembly drawing Figure 9 Assembled outer frame ...

Page 10: ...8x feet Figure 10 Final assembly drawing 4 Attendance Do not disassemble the weighing table without looking at the assembling instructions Do not shift the table by force or abruptly We recommend you lift the table and then cautiously put it down again To clean off stains wipe the table with a soft cloth soaked in detergent Do not use organic solutions for wiping off stains Place the weighing tabl...

Reviews: