
9 Technical examination
•
Technical examination by expert staff is required every three
months.
The examination should include the following:
•
Condition of connection to earth for balance display unit, including:
o
Fastening of display housing and electrical resistance -
max. 100Ω,
o
Fit a flexible steel tube for the protection of the conductor leading to the
platform balance and the display unit (regular balances with “cabled”
display).
•
The quality of the connection between the platform and the display unit (flexible
steel tube connecting both subassemblies).
•
Damage and loss of a connection is inacceptable.
•
The electrical connection between the housing and the platform – the maximum
resistance between the weighing pan
(put on) should be less than100Ω.
•
Stability and levelling of the balance.
Doc.No.OEX-BA-e-1411
15