
16
DDX5022/5022Y/5032/5032M/512/52RY
DNX5120/512EX/5220/5220BT
TEST MODE
1 Operations
The system can be transferred to the Test mode with the
following two approaches:
q
DNX/DDX : [SRC] key+[ATT] key
KVT
: [OPEN] key+[SRC] key
While keep pressing the above key, press [Reset] key to
start the system.
w
In the standby source mode while the system is in the
ON condition (in the normal condition), enter “2
→
Seek
Up
→
3” with (SW: AUD) of the remote controller.
Turn the system OFF in 30 minutes when it is started in the
Test mode.
Do not display the Opening screen when the system is
started in the Test mode.
2 Screen transition
The system is started with the Test Mode Main screen when
it is started in the Test mode. When the system is trans-
ferred to the Test mode using the remote controller, it trans-
fers to the Test Mode Main screen.
A variety of screens that can be transferred from the Test
Mode Main screen is shown in Figure 2.
Refer to Section 3 for the functions in each screen.
3 Speci
fi
cation of screens
This section describes the Test mode functions available in
each screen.
3.1 Test Mode Main screen
This section describes the keys that can be used to transfer
to each screen.
Contents of the display shown in the Test Mode Main
screen are described in Figure 3.1.
Test Mode Main
Information
Touch
Auto Adjust
Service
HPOSI
Inverter
Direct Select
iPod
NAVI
Bluetooth
Figure 3.1 Test Mode Main screen
Test Mode Main
Information
Service
Direct Select
Touch
HPOSI
iPod
Auto Adjust
Inverter
NAVI
Bluetooth
Inverter
High/Low
Auto Adjust
Start
iPod
Certification
Graphic
Touch Adjust
Source
Audio
Setup
E2PROM
Write
NAVI
E2PROM
Write
Serial/Tuner
etc
E2PROM
Write
E2PROM
Write
Figure 2 Screen transition