![Kenmore 795.69292.902 Service Manual Download Page 18](http://html.mh-extra.com/html/kenmore/795-69292-902/795-69292-902_service-manual_1954957018.webp)
- 18 -
6-2 PTC / COMBO AND OLP
6
5
Shows continuity
Open
Separate PTC-Starter/Combo
from Compressor and
measure resistance
between No. 5 and 6
of PTC-Starter with a
Tester.
(Figure 1 and figure 2)
Observation value is
115V/60Hz : 6.8 ±30%
The resistance value
is 0 (short) or
8(open).
Check another
electric component.
Replace OLP.
Replace PTC-
Starter/Combo
Figure 1
Figure 2
Figure 3
Normal operation of
compressor is impossible
or poor.
Separate OLP from
compressor and check
resistance value between
two terminals of OLP with a
tester.
(Figure 3)
?
at room temperature
PTC/ Combo OK
OLP OK