- 12 -
6-2 PTC AND OLP
6
5
Shows continuity
Open
Normal operation of
Compressor is
impossible or poor.
Separate PTC-Starter
from Compressor and
measure resistance
between No. 5 and 6
of PTC-Starter with a
Tester.
(Figure 14)
Separate OLP from
Compressor and check
resistance value
between two terminals
of OLP with a Tester.
(Figure 15)
Observation value is
115V/60Hz : 6.8 ±30%
The resistance value
is 0 (short) or
u (open).
Check another
electric component.
Replace OLP.
Replace PTC-
Starter.
Figure 14
Figure 15
Summary of Contents for 795.65002.402
Page 10: ...GY GRIS GRAY 10 5 CIRCUIT DIAGRAM ...
Page 36: ...8 5 MAIN PWB ASSEMBLY AND PARTS LIST 8 5 1 Main PWB Assembly 36 ...
Page 37: ...8 5 2 Replacement Parts List 37 ...
Page 38: ...8 5 3 PWB Assembly Display And Parts List 38 ...
Page 39: ...8 6 PWB DIAGRAM 8 6 1 PWB Main Assembly 39 G5S 1A RY5 ...
Page 40: ... 40 ...
Page 52: ......