
1.Defrost is performed whenever total operation time of compressor becomes 7-50 hour.
2. In providing initial power (or returning failure), frost removal starts whenever total operation time of compressor
becomes 4-5 hours.
3. Defrost is completed if temperature of a defrost sensor becomes more than 5°C after starting defrost. The defrost cycle will
fail if the refrigerator does not reach a temperature of 5°C (9°F) two hours into the defrost cycle.
4. The defrost cycle will not operate of the defrost sensor fails, arcs or shorts cut.
2-11 Defrost function
2-10. Ringing of compulsory operation, compulsory frost removal buzzer
2.12 Refrigerator lamp automatically off
- 14 -
1. If pressing the test button in the Main PCB, a beep will sound.
2. In selecting compulsory operation, alarm sound is repeated and completed in the cycle of On for 2/10 second and Off for
1 8/10 second three times.
3. On selecting compulsory frost removal, alarm sound is repeated and completed in the cycle of On 2/10 second, Off for
2/10 second, On for 2/10 second and Off for 1 4/10 second three times.
Refrigerator lamp turns on and off by refrigerator door switch.
If refrigerator lamp continuously turns on more than 7 minutes, the refrigerator room turns off automatically period.
Summary of Contents for 795.58812.900
Page 20: ...6 EXPLANATION FOR MICOM CIRCUIT 20 1 1 Power Circuit 1 Explanation for PWB circuit ...
Page 21: ... 21 1 2 Main PCB Top View TAB2 TAB1 CON1 CON2 CON3 CON4 CON9 CON5 CON6 CON8 CON7 ...
Page 30: ... 30 models 3 Icemaker Circuit ...
Page 31: ... 8 TROUBLE DIAGNOSIS 31 ...
Page 32: ... 32 ...
Page 33: ...tor d 33 ...
Page 34: ... 34 ...
Page 35: ...nt at st 35 ...
Page 36: ... 36 ...
Page 37: ... 37 ...
Page 38: ... 38 ...
Page 39: ... 39 ...
Page 40: ... 40 ...
Page 41: ... 41 ...
Page 42: ... 42 ...
Page 43: ... 43 ...
Page 44: ... ü ü ü ü ü 44 ...
Page 45: ...ü ü 45 ...
Page 46: ... 46 ...
Page 47: ... 47 ...
Page 48: ... 48 ...
Page 49: ... 49 ...
Page 50: ... s 50 ...
Page 51: ... 51 ...
Page 52: ... 52 ...
Page 53: ... 53 ...
Page 54: ... 54 ...
Page 55: ... 55 ...
Page 56: ... 56 ...
Page 57: ...3 Sealed System Heavy Repair 57 Summary of Heavy Repair ...
Page 58: ... 58 Precautions during heavy repair ...
Page 59: ... 59 ...
Page 60: ... 60 ...
Page 61: ... 61 ...
Page 62: ... 62 ...
Page 63: ... 63 ...
Page 64: ... 64 ...
Page 65: ... 65 ...
Page 66: ... 66 ...
Page 67: ... 67 ...
Page 69: ... 69 ...
Page 70: ... 70 5 WATER VALVE DISASSEMBLY METHOD ...
Page 72: ... 72 19 7 13 12 4 1 2 3 22 18 10 15 9 8 17 14 16 ...
Page 73: ...FREEZER DOOR EXPLODED VIEW 241G 241G 203A 201A 200A 241F 243A 241G EV 212J 244A 73 ...
Page 85: ...March 2009 ...