
14
CONNECTING
• Connect the machine to the tractor’s rear 3-point linkage.
• Connect the PTO shaft. Secure the chain properly.
• Connect hydraulic hoses. Raise the equipment and check its functioning.
• Ready for use.
TIGHTEN BOLTS AFTER A FEW HOURS OF OPERATION!!!
SERVICE
INTERVAL
MEASURE
Flails
Before each use
Replace all defective flails. Sharp blades give better results.
When replacing blades, tighten bolts fully.
While operating
Listen out for noises
After each use
Check
Gearbox
Before each use
Check level
Transmission oil
80W-90
50 hours of operation
First oil change
100 operating hours or
a minimum of once a year
Oil change
Volume: 1.5 L
Oil in the pipe: 0.2 L
Rotor
After 20 hours of operation
Lubrication
Belts
After one hour of operation
Regularly
Belt tension: checking and tensioning.
The belt should move 20 mm under pressure.
Hydraulics
Before each use
Check that all hoses are intact, connected and leak-proof
The equipment
After each use
Wash off earth and grass with water
FAULT
MEASURE
The flail mower cuts unevenly or badly
Check that all flails are intact and firmly in position.
Adjust the support roller and check that is in the correct position.
Check the drive belts and tighten if necessary.
The cutting sound changes
Check the roller.
Check the tension of the drive belts.
Check the flails.
Vibrations
Check the flails.
Hydraulics do not work
Check hoses and connections.
Summary of Contents for 35-WKH195
Page 18: ...18 Table of Contents ...
Page 20: ...20 Table of Contents ...
Page 23: ...23 Table of Contents Y flails article no R35 SK180 003 Spacer article no R35 VKM175 008 ...
Page 24: ...24 Table of Contents MOVEMENT PATTERN ...
Page 25: ...25 Table of Contents NOTES ...
Page 26: ...26 Table of Contents NOTES ...