Keller minimal windows 4+ Manual Download Page 27

27

Keller minimal windows

®

Keller minimal windows

®

4+

07

( 1 : 3 )

( 1 : 1 )

di

es

Ze

ich

nu

ng

 b

eh

al

te

wi

un

al

le

 R

ec

ht

vo

r,

 a

uc

de

Fa

ll 

de

Pa

te

nt

er

te

ilu

ng

Ge

br

au

ch

s-

 o

de

Ge

sc

hm

ac

ks

mu

st

er

ei

nt

ra

gu

ng

.  

Oh

ne

 u

ns

er

sc

hr

ift

lic

he

 Z

us

tim

mu

ng

 d

ar

we

de

di

Ze

ich

nu

ng

 s

el

bs

t,

 n

oc

Ve

rv

ie

lf

äl

tig

un

hi

er

vo

od

er

 s

on

st

ig

W

ie

de

rg

ab

en

 d

es

 

vo

lls

nd

ig

en

 o

de

au

sz

ug

sw

ei

se

In

ha

lt

Dr

itt

en

 z

ug

än

gl

ich

 g

em

ac

ht

od

er

 in

 a

nd

er

er

 W

ei

se

 m

is

sb

uc

hl

ich

 v

er

we

nd

et

 w

er

de

n.

Th

is

 d

ra

wi

ng

 is

 p

ro

te

ct

ed

 b

co

py

rig

ht

 l

aw

.  

Th

au

th

or

 r

es

er

ve

al

rig

ht

s,

 in

cl

ud

in

al

pa

te

nt

 g

ra

nt

s,

 r

eg

is

te

re

ut

ili

ty

 m

od

el

an

re

gi

st

er

ed

 d

es

ig

ns

.  

Th

dr

aw

in

is

 t

be

 t

re

at

ed

 c

on

fid

en

tia

lly

 a

nd

 m

ay

 b

us

ed

 o

nl

by

 t

he

 p

er

so

re

ce

iv

in

pe

rm

is

si

on

 f

ro

th

au

th

or

 a

nd

on

ly

 f

or

 t

he

 p

ur

po

se

 a

gr

ee

on

.  

W

ith

ou

th

pr

io

wr

itt

en

 c

on

se

nt

 o

th

au

th

or

ne

ith

er

 t

he

 d

ra

wi

ng

, n

or

 c

op

ie

of

 t

he

 d

ra

wi

ng

no

ot

he

re

pr

od

uc

tio

ns

 o

th

co

nt

en

ts

in

 w

ho

le

 o

in

 p

ar

t, 

ma

be

 m

ad

av

ai

la

bl

to

 t

hi

rd

 p

ar

tie

or

 m

is

us

ed

 in

 a

ny

 o

th

er

 w

ay

.

02 

A3

KELL-16-0007

Status

Änderungen

Datum

Name

Gezeichnet

Kontrolliert

Datum

Name

24.05.2012
30.05.2012

T. Franssen
W. Schulzen

Referenz:

Titel:

Zeichnungs-Nr.:

Maßstab: 1:2

profil Fräs- & Bohrbild

MWP Seitliches Einfass-

minimal windows 4+

Material:

Schutzvermerk ISO 16016 beachten.

Refer to protection notice ISO 16016.

20

20

20

20

20

20

20

20

Bohrung bei der 
Montage hinzufügen
(add hole at 
installation)

4

4

Eckpfosten an Schiebeflügel
(Corner post on sliding leaf)

Eckpfosten an Festflügel
(Corner post on fix leaf)

Schraubkonsole Eckpfosten 26-04-380
(Screwing block for corner post 26-04-380)

26-04-380

M5x12

M5x25

Zylinderkopfschraube
Cylindrical head screw

Zylinderkopfschraube
Cylindrical head screw

Montage Eckpfosten - zusätzliches Bohrbild
Installation of corner post - additional hole pattern

01

TF

09.06.2012

Abstreifer bei Eckpfosten 

hinzugefügt

02

Dichtstück oben bei Eckpfosten 

hinzugefügt

13.09.2012 TF

6

Anschlag-Einstellung
für Bohrung
(Setting for drilling)

Alternative:
Linsenkopfschraube ST4,8 x 13 ohne Vorbohren
Lens head screw ST4,8 x 13 without drilling

03

Anschlageinstellung hinzugefügt

Alternative Schraube hinzugefügt

29.10.2012 TF

04

MWP Dichtsatz entfernt & 

Abdeckkappen hinzugefügt

14.04.2014 TF/BS

218168

On-site installation | 

997-000120

 | 07-2021

7. Additional components

7.1  Corner post installation

7.2  Bottom & ceiling sleeve adjustment for 2-point locking (slot aeration)

7.1

See drawing: KELL-16-0007.02

7.2.1

Push sliding leaf aside; then approximatively position 
bottom and ceiling sleeves. Predrill screwing holes and 
screw sleeves.

7.2.2

For fine adjustment, loosen top center screw and position 
upper sleeve portion. Once the sleeve is in its final postion, 
re-tighten top center screw.

Summary of Contents for minimal windows 4+

Page 1: ...Keller minimal windows 4 07 2021 On site installation 997 000120 EN MANUALS...

Page 2: ...97 000120 07 2021 Contents Introduction to on site installation Drainage base preparation Outer frame assembly Sliding rail installation Corner stiffening installation Insertion of the glazing Additio...

Page 3: ...t Glass rack supplied by glass manufacturer Tools Equipment Glass installation robot and or crane Tape measure Level 5 point laser Drilling machine Caulking gun Forex spacers in different thicknesses...

Page 4: ...xcl levelling OKRB 260 0 Sealing foil EPDM Levelling max 20mm for smallest dimension Drainage base frame PVC U Drainage Substructure Keller minimal windows basestone Sealing foil EPDM Drainage base fr...

Page 5: ...d 350mm the lower the substructure the shorter the distance between the spacers This helps to avoid bumps in the lower outer frame The substructure must be fixed to the structure using suitable fixing...

Page 6: ...rkflow 2 Drainage base preparation 2 4 2 After allowing the mounting glue to dry for approx 60 min use spacers in various thicknesses in order to achieve a perfectly horizontal substructure for the Ke...

Page 7: ...2 4 Standard substructure workflow 2 Drainage base preparation 2 4 3 Place Keller minimal windows basestone onto spacers then level it using the levelling device As the length of the basestone corresp...

Page 8: ...m 350mm 350mm On site installation 997 000120 07 2021 2 4 Standard substructure workflow 2 Drainage base preparation 2 4 4 Predrill Keller minimal windows basestone and screw through spacers As with t...

Page 9: ...econd layer of Keller minimal windows basestone is being placed it is obligatory to fix it with mounting brackets according to static requirements 2 4 6 Outside EPDM sealing 500 mm or 700 mm available...

Page 10: ...07 2021 Keller minimal windows minimal windows 4 04 2021 997 000119 EN MANUALS Outer frame joints drainage base sealing 3 Outer frame assembly 3 1 1 For detailed workflow see instruction 997 000119 EN...

Page 11: ...3 Outer frame assembly 3 2 Outer frame assembly 3 2 1 Optional if fly screens are fitted Screw grub screw into forward corner connector to allow installation of lateral outer frames 3 2 2 Clean lower...

Page 12: ...chulzen Referenz Titel Zeichnungs Nr Ma stab 1 3 dung 1 bis 3 spurig MWP BL 60 80 Eckverbin minimal windows 4 Material Schutzvermerk ISO 16016 beachten Refer to protection notice ISO 16016 1x 1x 4x 3...

Page 13: ...sembly 3 2 Outer frame assembly 3 2 6 After fitting the lateral outer frames fit upper outer frame Insert corner connectors on one side first then on the opposite side To avoid damage always use a bea...

Page 14: ...0120 07 2021 3 Outer frame assembly 3 2 Outer frame assembly 3 2 10 Constantly check outer frame alignment with 5 point laser 3 2 8 Stabilise long elements with a support in the middle before insertin...

Page 15: ...crew drainage profile from outside 3 2 12 Connect drainage profile with Keller minimal windows basestone on the inside using fixing lug 25 11 120 Shimming below drainage base is not allowed after this...

Page 16: ...l windows 4 03 On site installation 997 000120 07 2021 3 Outer frame assembly 3 2 Outer frame assembly 3 2 14 Insert fixing bushings and fix outer frame with adjustment screws 3 2 15 Regularly check o...

Page 17: ...3 Outer frame assembly 3 2 Outer frame assembly 3 2 16 Check outer frame alignment again after fixing and fine tune if necessary to ensure perfect installation If elements are installed according to...

Page 18: ...llation 997 000120 07 2021 4 Sliding rail installation 4 1 If elements with a sliding leaf are installed the sliding rail has to be positioned using a beating block and fixed with fixing clamps 26 00...

Page 19: ...push the sliding rail in the bottom outer frame Push the sliding rail clamp with a flat screwdriver to the bottom Beware don t pusch to hard because the clip can break After assembly these clips must...

Page 20: ...lation 997 000120 07 2021 Keller minimal windows minimal windows 4 04 2021 997 000119 EN MANUALS Outer frame joints drainage base sealing 5 Corner stiffening installation 5 1 For detailed workflow see...

Page 21: ...06 On site installation 997 000120 07 2021 This operation must be done for both sliding as for fix glazing panels 6 Insertion of the glazing 6 1 Preliminary work 6 1 1 Clean glazing 6 1 2 Measure and...

Page 22: ...sertion of the glazing 6 2 Sliding leaf installation 6 2 1 Wrap two small aluminum sheets with tape and place them onto the lower outer frame 6 2 2 Insert sliding leaf into the upper outer frame first...

Page 23: ...021 6 Insertion of the glazing 6 2 Sliding leaf installation 6 2 4 Lift sliding leaf and remove aluminum sheets Then place element onto sliding rail 6 2 5 Underlay handle bars and junction profiles wi...

Page 24: ...Sealing pack see drawings KELL 16 0013 01 10 Dichtsatz siehe Zeichnungen KELL 16 0013 01 10 Sealing pack see drawings KELL 16 0013 01 10 Gewindestifte mit Zapfen DIN 915 Set screw with pin DIN 915 26...

Page 25: ...6 04 092 Beispiel Example 02 02 02 02 A 1 1 A F r diese Zeichnung behalten wir uns alle Rechte vor auch f r den Fall der Patenterteilung Gebrauchs oder Geschmacksmustereintragung Ohne unsere schriftli...

Page 26: ...chulzen Referenz Titel Zeichnungs Nr Ma stab 1 5 Festfl gelauflagen Montage Arretierungen minimal windows 4 Material Schutzvermerk ISO 16016 beachten Refer to protection notice ISO 16016 Typ 6 Type 6...

Page 27: ...16 beachten Refer to protection notice ISO 16016 20 20 20 20 20 20 20 20 Bohrung bei der Montage hinzuf gen add hole at installation 4 4 Eckpfosten an Schiebefl gel Corner post on sliding leaf Eckpfos...

Page 28: ...llation 997 000120 07 2021 8 Inside sealing of the outer frame 8 1 The inside EPDM sealing 500 mm or 700 mm available is to be carried out as follows see red arrow dashed line Cleaning and dusting of...

Page 29: ...ller minimal windows Keller minimal windows 4 09 On site installation 997 000120 07 2021 9 Optional Gutter installation 9 1 An optional gutter can be fitted in front of the outer frame On site substru...

Page 30: ...d C 4 and C Remarks Digit 7 and 8 in the classification key Digit 3 and 4 in the classification key Digit 7 and 8 in the classification key As a protective fitting or a protective rosette according to...

Page 31: ...re free from the property rights of third parties The reproduction of common names trade names product descriptions etc in this work does not justify the assumption that such names are to be considere...

Page 32: ...07 2021 www minimal windows com...

Reviews: