In this section:
Introduction .............................................................................. 3-1
Initial equipment startup ........................................................... 3-1
System startup ......................................................................... 3-2
Before starting system software ............................................... 3-3
Start the KTE software ............................................................. 3-4
Shut down using KTE ............................................................... 3-5
Emergency OFF button ............................................................ 3-5
Safety interlocks ....................................................................... 3-6
LO patch panel and safety interlock ....................................... 3-10
Prober safety .......................................................................... 3-10
Network information ............................................................... 3-11
Introduction
All of the instruments in the equipment rack are connected to one of the two power distribution units
(PDUs) in the system.
Follow the instructions in the following topics to start up your system and software.
Initial equipment startup
To begin equipment startup:
1.
Check that all power cords for the system cabinet are connected to AC power.
Make sure that the circuit breakers on the power distribution units (PDUs) are in the ON position.