
Model 2520 Pulsed Laser Diode Test System Service Manual
Routine Maintenance
3-3
Perform the following steps to replace the line fuse:
1. Using a small flat-blade screwdriver, carefully release the locking tab that secures
the fuse carrier to the power module.
2. Pull out the fuse carrier, and replace the fuse with the type specified in
CAUTION
To prevent instrument damage, use only the fuse rating and type spec-
ified in
.
3. Re-install the fuse carrier, pushing it in firmly until it locks into place.
NOTE
If the power line fuse continues to blow, a circuit malfunction exists and must be
corrected. Refer to
“Troubleshooting” on page 4-13
for additional information.
Table 3-1
Power line fuse
Line voltage
Fuse rating
Keithley part no.
100-240V
1.6A slow blow, 250V, 5
×
20mm
FU-106-1.6
Summary of Contents for 2520
Page 10: ......
Page 13: ...1 PerformanceVerification...
Page 30: ......
Page 31: ...2 Calibration...
Page 68: ...2 38 Calibration Model 2520 Pulsed Laser Diode Test System Service Manual...
Page 69: ...3 RoutineMaintenance...
Page 72: ...3 4 Routine Maintenance Model 2520 Pulsed Laser Diode Test System Service Manual...
Page 73: ...4 Troubleshooting...
Page 90: ...4 18 Troubleshooting Model 2520 Pulsed Laser Diode Test System Service Manual...
Page 91: ...5 Disassembly...
Page 98: ...5 8 Disassembly Model 2520 Pulsed Laser Diode Test System Service Manual...
Page 99: ...6 ReplaceableParts...
Page 116: ...6 18 Replaceable Parts Model 2520 Pulsed Laser Diode Test System Service Manual...
Page 117: ...A Specifications...
Page 121: ...B CalibrationReference...
Page 132: ...B 12 Calibration Reference Model 2520 Pulsed Laser Diode Test System Service Manual...
Page 136: ......