
Short and open calibration
1.
Connect the Model 2188 low-thermal shorting plug to the instrument input jack, as
shown in
. Wait at least three minutes before proceeding to allow for thermal
equilibrium.
2.
Send the following command:
:CAL:PROT:DC:STEP1
3.
After the Model 2182 completes this step, remove the low-thermal short, and send this
command:
:CAL:PROT:DC:STEP2
Figure 2-4
Low thermal short connections for factory calibration
DC volts calibration
After front panel short and open steps, do the following:
1.
Connect the calibrator to the Model 2182 as shown in
. Allow two minutes for
thermal equilibrium.
2.
Perform the calibration steps summarized in
. For each step:
•
Set the calibrator to the indicated voltage, and make sure the unit is in operate. (Use
the recommended voltage if possible.)
•
Allow the signal voltage to settle.
•
Send the indicated programming command. (Change the voltage parameter if you
are using a different calibration voltage.)
•
Wait until the Model 2182 completes each step before continuing.
Table 2-8
DC voltage remote calibration programming steps
Calibration step Calibrator voltage
Calibration command*
Parameter range
+10V
+10.000000V
:CAL:PROT:DC:STEP3 10
9 to 11
-10V
-10.000000V
:CAL:PROT:DC:STEP4 –10
-9 to -11
* Change parameter accordingly if using a different calibrator voltage.
2182
NANOVOLTMETER
RANGE
!
CHANNEL 1
SHIFT
LOCAL
POWER
RANGE
SHIFT
CH1
REM
TALK
LSTN
SRQ
STAT
REL
FILT
4W
BUFFER
MATH
REAR
SCAN
TIMER
STEP
CH2
CH3
CH4
CH5
CH6
CH7
CH8
CH9
CH10
HOLD
TRIG
FAST
MED
SLOW
AUTO
ERR
AUTO
HI
LO
CHANNEL 2
HI
LO
120V MAX
12V MAX
CAT
I
350V PEAK ANY
TERMINAL TO CHASSIS
EXIT
ENTER
DIGITS RATE
ON/OFF
VALUE
TRIG
EX TRIG
STORE RECALL
DCV1
V
1
/
V
2
MX+B
%
V
1
-V
2
DCV2
ACAL
FILT
REL
TEMP
1
TEMP
2
TYPE
A
OUT
TCOUPL
DELAY
HOLD
RS232
GPIB
STEP
SCAN
CAL
TEST
OUTPUT
SAVE
RESTR
CONFIG
HALT
BUFFER
SETUP
LIMITS
2188 Low
Thermal Short
LSYNC
Calibration
2-15
Summary of Contents for 2182
Page 10: ......
Page 14: ...1 Performance Verification Performance Verification...
Page 25: ...1 12 Performance Verification...
Page 26: ...2 Calibration Calibration...
Page 43: ...2 18 Calibration...
Page 44: ...3 Routine Maintenance RoutineMain tenance...
Page 47: ...3 4 Routine Maintenance...
Page 48: ...4 Troubleshooting Troubleshoot ing...
Page 64: ...5 Disassembly Disassembly...
Page 73: ...5 10 Disassembly...
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ...6 Replaceable Parts Replaceable Parts...
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ...A Specifications Specifica tions...
Page 96: ...B CalibrationReference Calibration Reference...
Page 109: ...B 14 Calibration Reference...
Page 110: ...C CalibrationProgram Calibration Program...
Page 115: ...C 6 Calibration Program...
Page 119: ......