4.1 First Startup
When first power on, if it shows the power-on password page, as shown in Figure4-1, please contact
the agent to obtain the startup password. The corresponding button function is as shown in Table4-1.
After entering the right password, it will show the main page.
Power-on Psw:
0 0 0 0 0 0
0
Figure4-1
Power-on password page
Table4-1
Button function on power-on password page
Button
Function
Short press: add the number value
Long press: clear enter value, the cursor back to the first position
Short press: reduce the number value
Long press: confirm the current entering, and the cursor move to right
4.2 Main Page
Main page can show date & time, inverter status, as shown in Figure4-2. When the inverter is grid-
connected, the main page will show the daily power, gross power and output power circularly, as shown
in Figure4-3 to Figure4-5. The corresponding button function is as shown in Table4-2
17/01/01 12:00
Status: STANDBY
Figure4-2
Main page
17/01/01 12:00
E_daily 000.0kWh
Figure4-3
Grid-connected main page (1)