![KEHUA TECH SPI-B2S Series User Manual Download Page 34](http://html1.mh-extra.com/html/kehua-tech/spi-b2s-series/spi-b2s-series_user-manual_3977051034.webp)
3Installation Guide
PV Grid-Connected Inverter SPI-B2
S
Series
(1500-6000) User Manual
26
All rights reserved ©Xiamen Kehua Digital Energy Tech
Co.,Ltd
Figure3-23
Connect the wires of AC connector
There is L, N, PE mark on the AC connector, the wire connection must be accord with the mark
correspondingly.
Step 3
Insert the AC connector to the GRID port (as shown in Figure3-24) and lock it.
Figure3-24
Insert the AC connector
When inserting the AC connector, please pay attention to the gap on the AC connector and make it
align the heave on the GRID port, avoid damaging the connector.
----End