background image

USER MANUAL 

Spirit User manual 

 

page 5 

Mains switch 

The mains switch (see Figure 3 a) is located at the right hand side of the machine and has 3 positions: 

OFF 

All power to the machine is disconnected. 

NO HEAT 

The machine is connected to power, but power to the heating elements is disconnected. 
The machine functions but there is no heat and thus neither hot water nor steam 
pressure. The lack of steam pressure means that flow from the hot water spout is less 
than normal.  

ON 

Machine and heating elements are connected to power. 

 

  

 

Figure 3 a (left). Showing mains switch with its 3 positions, the right hand brew lever and steam lever 
on the right steam wand. 
Figure 3 
b (right). Showing hot water lever and -spout and a coffee boiler pressure gauge. 

 

Back light switch 

The LED

’s that illuminate the Spirit or customers logo on the back side of the machine can be turned 

ON or OFF. When the machines leaves the shop, the illumination is turned OFF to make sure that you 
use the switch at least once. The switch is located behind the right hand side front leg of the machine 
(see Figure 4). 

 

Figure 4

. Showing the switch that turns the back LED’s on and off (lever pointing down is OFF). 

 

 

hot water lever 

brew lever  steam lever 

mains 

switch 

steam 

wand 

hot water 

spout 

coffee 

pressure 

gauge 

back 

light 

switch 

Summary of Contents for Spirit DUETTE

Page 1: ...Spirit User manual page 0 User manual Spirit original instructions Document ID Sup Rum Eng Date of issue October 22 2015 Revision date June 24 2020...

Page 2: ...Change boiler temperatures 13 Switch boiler temperatures with St rk ST25 Eco controllers 13 Procedure to change from operational to Eco mode 13 Procedure to return from Eco to operational mode 13 Proc...

Page 3: ...imilarly qualified persons in order to avoid a hazard The new hose sets supplied with the appliance are to be used Old hose sets should not be reused Intended use of the appliance is restricted to wel...

Page 4: ...e 30 0 50 ppm Chloride 0 0 30 ppm Silica 0 0 5 ppm Odour and colour clean fresh odour free clear Taste influencing organic compounds not present Chlorine Hypochlorite Chloramines Iron Lead Manganese S...

Page 5: ...boiler heating ON OFF switch 6 Coffee boiler PID temperature controller left group 7 Coffee boiler heating ON OFF switch left group 8 Volume switch left group 9 Program button left group 10 Group ind...

Page 6: ...Showing mains switch with its 3 positions the right hand brew lever and steam lever on the right steam wand Figure 3 b right Showing hot water lever and spout and a coffee boiler pressure gauge Back l...

Page 7: ...consistent volume programming procedure should be followed to have Consistency in programmed volumes Volumes should be programmed as if you are making a normal brew with fresh coffee grinds in the fil...

Page 8: ...low to very fast flow we install different flow meters for different preferred brews 0 7mm aperture 3300 pulse litre for short brews like ristrettos and espressos 1 15mm aperture 2000 pulse litre for...

Page 9: ...Have a pre filled and tamped portafilter ready 1 Keep the upper button 5 of the left hand touchpad pressed for 6 seconds until the upper LEDs of all touchpads start flashing to enter the programming m...

Page 10: ...tton on the left touchpad turn the mains switch to NO HEAT or ON 3 The cleaning program pressurises and de pressurises all groups simultaneously for 8 times in a row 4 As soon as the program has ended...

Page 11: ...mped portafilter ready 1 Keep the push button of the left group pressed for about 6 seconds until the LEDs of all Bastones start flashing to enter the programming mode You may now program any one of t...

Page 12: ...k flush program See paragraph Back flush group on page 19 for complete back flush procedure 1 Shut down machine by turning mains switch to OFF 2 Make sure that the toggle switch under the left hand gr...

Page 13: ...sition steam valve closed Before steaming milk it is necessary to open the valve for a short while to purge water from the steam wand and heat up the wand and valve The purged water is condensate from...

Page 14: ...7 70 158 Coffee boiler 93 199 50 122 Display example 125 Turn power OFF and ON Eco Table 3 Factory set temperatures in the Spirit and way to switch between modes Procedure to change from operational t...

Page 15: ...ee bed and drain the pressure gauge will display 0 bar When brewing a shot the coffee bed becomes less permeable after wetting pre infusion stage and pressure will rise until brew pump pressure is rea...

Page 16: ...ispensing by shortly pressing the hot water lever down Water will start flowing Note Work swiftly the boiler quickly empties when hot water is dispensed continuously 4 Measure the temperature of the o...

Page 17: ...nor influence During the extraction phase it is mainly pump pressure and coffee bed characteristics that determine the flow rate Variables in the coffee bed are numerous the most important depend on t...

Page 18: ...iour All lights should be in sync with the indicator dot on the corresponding temperature controller If there is a problem with the machine these indicator lights help to determine possible causes Fig...

Page 19: ...drain and flush it with some hot water down the drain to prevent clogging of the drain hose Remove filter basket Materials needed Group screen extractor or back end of teaspoon Procedure 1 Remove the...

Page 20: ...essurised you do the same with the next group etc Described next is the procedure for an individual group in which the other group s remain s operational Materials needed Plastic group brush included...

Page 21: ...uncture the group screen Pry left and right the screen will fall out together with the group seal 2 Remove the group seal from the group screen 3 Soak the metal group screen in a solution of coffee di...

Page 22: ...fork or spoon Plastic brush included in shipment Coffee dissolving powder included in shipment Procedure 1 Remove group screen and group seal see previous item 2 Remove the two bolts from the plastic...

Page 23: ...span than the black POM Procedure 1 Remove the group dispersion plate see previous item 2 Gently pull the dispersion base from the group bottom pull as perpendicular as possible Do not twist the disp...

Page 24: ...boiler for leakage Check opening pressure of expansion valves on inlet manifold adjust when necessary Every 6 months quarterly maintenance PLUS Check dispersion plate and base replace when necessary...

Page 25: ...Spirit User manual page 24 Maintenance Record machine number __________________ installation date _________________________________ Date Task Comments...

Page 26: ...annot be held responsible for damage and or injuries resulting from actions performed on our machines by non qualified personnel Any qualified technician working on the Spirit is urged to thoroughly r...

Reviews: