Spirit installation manual
page 3
Installation quickstart
If the information in this section is not sufficient
, we refer to the “installation manual” which you can
find in a following section (page 17 onwards) of this manual, or contact your local installation
technician.
1. Connect water
Install water treatment system (not in shipment), flush new cartridge, and connect water treatment
system to all pumps. Mount steam boiler pump as the last one
“downstream” of water treatment
system. Make sure water has run through the pump(s) before the electric motors start.
First pump downstream of water treatment system. Note corresponding colour-coding on hose and
cable-plug. The elbow end of the high pressure hose would normally be on the machine side..
Connect high pressure hoses of all pump outlets to Spirit according to table and picture below.
coffee
system
group 1 group 2 group 3
steam
boiler
2-pump
machines
“C”
green
“S”
red
pump/gr
Duette
“L”
green
“R”
purple
“S”
red
pump/gr
Triplette
“L”
green
“C”
purple
“R”
yellow
“S”
red
The photo shows letter and colour-coding on a pump/group Triplette.
T-fitting
Spirit
water
treatment
coffee
(group 1)
pump
next
pump
L
C
R
S