·
10
·
Operating steps(Use robot)
(Front view)
(Back view)
(Top view)
13.
Indicate lamp
14.
Heat radiation holes
15.
Charging touch sheet
Picture 2 Structure picture of charging piles
Pleasefollow the below stepsand start useyour
robot.
Installation
1.
Robot construct picture
Before robot self move, the robot need know well about it’ s move
environment, it saveand discriminatetherunning environmentby themap
method,thisstepcalled construct map.(Finished by professional technicians,
needn’ t user self operating ) When indoor environment of robot happened
important changes(example newly decorate, transport the robot to new
running field or goodsin room place again), pleasecontact customer service
400-9651-808, need newly construct map.
2.
Arrange charging piles
The robot has automatically return charging function, need arrange the
charging piles in it’ s running field convenient for charging, installation of
charging piles need be finished by manufacture’ s technicians. Please don’ t self
move once fixed.
If need change the position of charging piles, please contact 400-9651-808
newly set the position of chargingpiles.
Summary of Contents for PEANUT
Page 1: ...PEANUT intelligent transporting robots Product specification...
Page 6: ...7 to...
Page 7: ...8 the entity...
Page 10: ......