
6
Insert the Upper Canopy to the Pipe.
將上罩蓋嵌入導管。
Do not screw the Upper Canopy Screw /
切勿鎖緊上罩蓋螺絲
Pipe /
導管
Upper Canopy /
上罩蓋
Check Point After Installation /
安裝後的重點檢查
1. Insert the Upper Canopy to Pipe Assembly and the screw is not tightened. /
將上罩蓋嵌入導管組件,並且螺絲沒
被鎖緊。
Check /
檢查
2
2
First, insert the Cap to the Motor Shaft. Then, fi x the Pipe to the Motor Shaft.
Ensure the Switch Lever press the Switch.
首先, 將蓋子插入發動機轉動軸。然後將導管安裝至發動機轉動軸。
確定開關杆按壓開關。
2
2
Assemble Pipe To Motor Assembly /
組裝導管至發動機組件
B)
Pull the power cord (from power supply) and insert into the Pipe hole as shown.
拉電纜(自電源)並如圖所示將之插入導管孔。
1
1
(i)
(ii)
Pipe /
導管
Power Cord (from power supply)
電纜(自電源)
Ceiling /
天花板
Upper Canopy /
上罩蓋
M48SG_EN_CT.indd 6
M48SG_EN_CT.indd 6
1/5/2011 8:07:47 PM
1/5/2011 8:07:47 PM