background image

19

Installation Instruction

 Under the situation of Aircon operation

unavailable

Available operation

With 
Aircon

Button 

Button 

Button 

Without 
Aircon

Button 

Button 

Button 

 Remove the cover of switch box.

 

Remove the three screws 

fi

 xed in the 

cover of switch box.

The screws 

fi

 xed 

in the switch box

 Wire connection.

 

Peel off the skin of power supply cord by 
40 mm, and peel off the skin of each core 
wire by 10 mm.

10 mm

40 mm

On

High

Heat 

exchange

Off

Low

Normal 

ventilation

Model label

 

The power supply cord goes through the wire plug, 
as required in 

fi

 gure, 

fi

 x the wire connecting power 

supply cord and switch in the terminal block, and 

fi

 x the ground wire in the ground terminal.

 

The joint should not be pressured, use speci

fi

 ed 

tools to 

fi

 x the wire which links the power supply 

cord to switch.

 

In maintenance, in order to avoid pulling the switch 
box into the unit, please keep enough space for 
the wire connecting the power supply cord and 
ground wire. To prevent it from touching the 
ceiling, please 

fi

 x it by ceiling suspension bolts.

Power supply cord (remain 50 cm)

Wire plug

M4 Nut

Ground 

terminal

Terminal 

block

 Fix the cover of switch box

 

After completing the wire connection, 

fi

 x the 

cover of switch box by screws.

 

(dust and moisture may cause the electric 
leakage or 

fi

 re.)

TRIAL OPERATION

 

After completion, never fail to check the ground wire connection and wiring and conduct the trial operation.

 

Check the display of switch and air

fl

 ow condition with power on after con

fi

 rming the wiring 

connection, power and voltage.

Switch

On /Off

Ventilation/stop

Air volume

High/low

Con

fi

 rm the air volume is changed as the power on/off

Heat exchange/
Normal ventilation

Damper 
closed/
open

Heat exchange (see the damper closed by opening side 
maintenance door)
Normal ventilation (see the damper open by opening side 
maintenance door)

 

Abnormal operation occurs, cut off the special purpose circuit breaker and con

fi

 rm the wire connection again.

 

Fix the cover of switch box after conducting the trial operation.

 

Please stick the model label to the switch or around.

  Model label is placed in the plastic bag, don’t forget to attach it.

Summary of Contents for E50DZUA

Page 1: ...ge 3 5 page 10 11 to make sure safe use After you ve read it keep it well so that you can easily find it if necessary Please be sure to give this instruction to end users KDK 30 29 24 22 Accessories M...

Page 2: ...TION DIAGRAM 7 PART NAME AND USING METHODS 7 8 HANDLING METHODS ON ABNORMAL OPERATION 8 MAINTENANCE METHODS 9 Installation Instruction SAFETY PRECAUTIONS 10 12 INSTALLATION DIAGRAM 13 PART NAME AND DI...

Page 3: ...otation inside the unit Please entrust the retail shop or specialized company to conduct the maintenance except the filter maintenance It may cause the fire r electric shocks and injuries Wet hands Pr...

Page 4: ...dirt dust and insects It may enter into eyes The appliance is forbidden to operate without Filter Box Unit Otherwise dirt or dust will accumulate in the energy recovery core It will lower its perform...

Page 5: ...iance usage in refrigerators or other places where temperature can fluctuate greatly It is prohibited even if a temperature range is acceptable Be careful of frost and dew As shown in the right figure...

Page 6: ...nded to exchange outdoor air and indoor air When the outdoor air comes in it may bring the insects from outdoor pipe hood to internal unit As insect occurrence is affected by natural environment it s...

Page 7: ...NG METHODS model label adhesive location Part Name Exhaust air Outside air Outdoor Indoor Supply air Filter Box Unit Energy Recovery Ventilator Remote control Return air Inside the ceiling Indoor filt...

Page 8: ...the room don t use the mode HANDLING METHODS ON ABNORMAL OPERATION If treated as fault Please check as the following list if abnormal operation occurs you should turn off the switch the breaker and co...

Page 9: ...placement filter Model No E25DZUA FB25DZUA E35DZUA FB35DZUA E50DZUA FB50DZUA Butterfly bolt Heat exchange core Screws Side maintenance door Indoor filter After using the ERV for a long time filter wil...

Page 10: ...gas pipeline water pipeline lightening rod and phone landline Wrong ground connection may cause electric shocks Ground connection When connecting lead wire to the ground terminal of outlet Plug outsi...

Page 11: ...n Please don t set the indoor air inlet in locations with high temperature or high humidity It may cause the damage inside the unit which can result in abnormal operation electric shock and fire Prohi...

Page 12: ...into the unit of air inlet air outlet It may cause the injury because of high speed rotation inside the unit Prohibition Don t install in location where may be exposed to the combustible gas leakage...

Page 13: ...t the damp air goes out of the room dew will occur in the internal duct In the conclusion the outdoor duct should be conducted with thermal insulation The air duct which connects the filter box unit t...

Page 14: ...bing air condition B are plotted on the air line figure then a high temperature air A is heat exchanged by the unit and goes out of the saturation curve as shown by point C In this case the unit will...

Page 15: ...bing air condition B are plotted on the air line figure then a high temperature air A is heat exchanged by the unit and goes out of the saturation curve as shown by point C In this case the unit will...

Page 16: ...ondition B are plotted on the air line figure then a high temperature air A is heat exchanged by the unit and goes out of the saturation curve as shown by point C In this case the unit will be dewed o...

Page 17: ...ZUA 220 BE25DZUA 240 E35DZUA 230 E50DZUA 240 BE50DZUA 350 2 the height of ceiling varies with different installation place The air duct which connects the filter box unit to ERV is suggested to instal...

Page 18: ...ion of 60227 IEC 53 soft wire At this time please use the three core wire containing green yellow wire for power supply cord besides use the two core wire for connecting SW1 SW2 and switch inside the...

Page 19: ...ent it from touching the ceiling please fix it by ceiling suspension bolts Power supply cord remain 50 cm Wire plug M4 Nut Ground terminal Terminal block Fix the cover of switch box After completing t...

Page 20: ...e unit The noise value measured at the total acoustic room is more than the indicated value in actual 5 The above parameters are measured according to standard JIS B 8628 Model No Inches of H2O CFM AT...

Page 21: ......

Page 22: ...22...

Page 23: ...23...

Page 24: ...24 40 40 85 40 10 JIS B 8628 2003 5 JIS B 8628 2003 6 65 29 35 60 17 22 6 5 50 14 20 6 15 50 14 20 JIS B 8628 2003 B C A C B...

Page 25: ...25 1 2 3 4 5...

Page 26: ...26...

Page 27: ...27...

Page 28: ...28 BE25DZUA E25DZUA E35DZUA BE50DZUA E50DZUA 1 90 2 1 2 12 3 FB25DZUA E25DZUA FB35DZUA E35DZUA FB50DZUA E50DZUA...

Page 29: ...29 60 220 1 6 ERV ERV 1 6 30 Ground connection...

Page 30: ...30 MCX100K...

Page 31: ...31 3 2 1...

Page 32: ...32 1 2 SA EA OA RA E25DZUA E35DZUA E50DZUA BE25DZUA BE35DZUA RA EB90SA SA OA EA...

Page 33: ...33 1 2 3 600 450 450 600 600 600 150 200 150 200 1 2 1 25 2 3 4 1 1 4 2 2 3 1 4 2 5 2 6 4 7 1 8 9 E25DZUA 2 3 4 5 6 7 8 1 1 9 1 1 1 3 3 9 1 1 1 1 3 3 1 2...

Page 34: ...34 3 4 5 6 7 8 2 1 9 1 1 1 1 3 3 9 1 1 1 1 3 3 1 2 1 2 3 600 450 450 600 600 600 150 200 150 200 1 2 1 25 2 3 4 E35DZUA 1 1 4 2 2 3 1 4 2 5 2 6 4 7 1 8 9...

Page 35: ...35 1 2 3 4 5 7 8 6 9 1 1 1 1 3 3 9 1 1 1 1 3 3 1 2 1 2 3 600 450 450 600 600 600 200 1 2 1 25 2 3 4 E50DZUA 1 1 4 2 2 3 1 4 2 5 2 6 4 7 1 8 9...

Page 36: ...36 1 M10 E25DZUA E35DZUA 1 2 1 2 E50DZUA 1 2 1 50 1 100 1 100 1 50 25 20 1 20 25 240 BE25DZUA 220 E25DZUA 230 E35DZUA 350 BE50DZUA 240 E50DZUA 2 20 25 20 25...

Page 37: ...2 1 5 4 6 7 3 3 4 1 2 2 1 4 3 8 8 7 2 3 1 5 6 2 3 1 4 5 6 4 5 3 1 A2 A1 Damper HI LO COM SW2 SW1 N L L N SW1 SW2 COM LO HI Damper A1 A2 220 60 3 220 60 1 1 HI SH LO 2 3 10 IEC 53 60227 500 300 1 2 2...

Page 38: ...38 50 M4 40 10 10 40...

Page 39: ...1 59 349 H 32 72 66 78 58 0 350 0 98 215 L 1 2 0 3 1 5 4 JIS B 8628 JIS B 8628 5 183 130 1 75 258 192 339 253 172 118 250 183 330 241 168 115 5 247 180 326 238 155 104 237 169 314 224 143 91 225 157...

Page 40: ...Issue date 10 2018 E50DZUA853E P0116 5108 KDK Company Division of PES Head Office 4017 Takaki cho Kasugai Aichi Japan KDK Company Division of PES 2016 2018...

Reviews: