4
D E S C R I P T I O N O F T H E A P P L I A N C E , B A S I C P A R T S ( s e e f i g . )
P R E P A R I N G T H E A P P L I A N C E F O R O P E R A T I O N
It is recommended to prepare the appliance for operation with a helper !
•
Remove package.
•
Remove the separate polystyrene part (transport protection) between the rear of the device and
condenser – metal grid (if available).
•
Lift the appliance away from foamed polystyrene base. Tear off adhesive tapes.
•
When positioning the appliance in chosen location, it will move more easily into position if you lift
the front a little and incline it backward, allowing it to roll on its casters.
Your appliance is fit with screwed handles to not rise or push it taking by
handles. Handles may break.
•
Remove all red-coloured parts (see fig. 2) from the shelves.
Tear away the red-coloured adhesive tapes – they are intended
only for the transport of the appliance.
Take two supports
1
from
the bag (see fig.) and insert them into the guides
2
at the top back
part of the appliance.
•
Suitably dispose the packaging material.
•
If the appliance is brought in from the cold (temperature is not higher than +12 °C), you should
wait for two hours before connecting it to the mains.
The appliance should not be connected to the mains until all packing and transport materials
aren’t removed.
1
Thermostat - temperature regulator
5
Condenser
2
On / off switch for interior light
6
Thaw water drip tray
3
Adjustable height shelves
7
Compressor
4
Shelf
Summary of Contents for K 331
Page 3: ......
Page 29: ...26 N00C2900 1 2014 05 27...