A s s e m b l y I n s t r u c t i o n s
|
6700
α
/6800
α
/7000
α/
7900
α
12
4.3.3 FIX CONTROL PANEL CABLE,
by clamping it behind the air nozzle as seen in the
figure.
4.3.4 LIFT OUT CANOPY PANE (TEMPORARILY)
Grip the pane at the two ends with the help of a sec-
ond person.
• Now lift the pane slightly on
③
and remove it from
the rear guide profile
④
.
• Lift the pane gently out towards the front of the tan-
ning area.
③
④
• Put the pane down on suitable protective padding
(such as cardboard, etc.).
4.3.5 OPEN BED PANE
• Hold the bed pane in the middle of the front edge
⑤
and lift it.
• Lock it in place using the lateral snap braces
⑥
.
⑤
⑥
⑥
4.3.6 REMOVE DUCTING PANE
⑦
,
⑦
transport to the installation site and set it down safely
on protective padding.
Summary of Contents for 7900a
Page 2: ......
Page 64: ...A s s e m b l y I n s t r u c t i o n s 6700α 6800α 7000α 7900α 64 Remarks ...
Page 65: ...A s s e m b l y I n s t r u c t i o n s 6700α 6800α 7000α 7900α 65 Remarks ...
Page 66: ...A s s e m b l y I n s t r u c t i o n s 6700α 6800α 7000α 7900α 66 Remarks ...
Page 67: ......
Page 68: ...Ringstraße 24 26 56307 Dernbach Germany fon 49 0 26 89 94 26 0 fax 49 0 26 89 94 26 66 ...