background image

ESUMN8-P2-B Quick Start Guide 

ESUMN8-P2-B Quick Start Guide-Rev1709.docx 

 

www.

kbcnetworks

.com 

Copyright © KBC Networks Ltd. 2017

   

 

Page 

9

 of 

11

 

          

 

                      Step 3                                                            Step 4 

 
Step 1: Remove the guide rail fastener;   
Step 2: Remove the DIN clamp in the rear panel; 
Step 3: Find the wall mounting accessory, and loosen these 4 screws in the Switch. 
Step 4: Mounting the accessory on the rear panel; 
Step 5: Fixed the switch on the wall. 

4.3  Items for attention 

 

Operating Ambient:

 If the product is installed in a closed rack, the inside operating 

ambient  temperature  of  the  rack  may  be  higher  than  outside.  Therefore, 
consideration  should  be  given  to  installing  the  equipment  in  an  environment 
compatible with the maximum operating temperature specified by the manufacturer.   

 

Air Flow:

 Installation of the equipment in a rack should be such that the amount of 

air flow required for safe operation of the equipment is not compromised.   

 

Circuit  Overloading:

  Consideration  should  be  given  to  the  connection  of  the 

equipment to the supply circuit and the effect that overloading of the circuits might 
have on overcurrent protection and supply wiring.   

 

Reliable  Earthing:

  Reliable  earthing  of  rack-mounted  equipment  should  be 

maintained. Particular attention should be given to supply connections other than 
direct connections to the branch circuit (e.g. use of power strips). 

 

4.4  Grounding 

Grounding  and  wire  routing  help  limit  the  effects  of  noise  due  to  electromagnetic 

Summary of Contents for ESUMN8-P2-B

Page 1: ...ESUMN8 P2 B Quick Start Guide Rev 1709 ...

Page 2: ...BC Networks Ltd 2017 Page 2 of 11 Index 1 INTRODUCTION 3 1 1 ESUMN8 P2 B INTRODUCTION 3 1 2 FEATURES 3 1 3 SPECIFICATIONS 3 2 PANEL VIEWS 5 2 1 Front panel view 5 3 DIMENSIONS UNIT mm 7 4 MOUNTING 8 4 1 DIN mounting 8 4 2 Wall mounting 8 4 3 Items for attention 9 4 4 Grounding 9 5 Cable 11 5 1 SFP port 11 ...

Page 3: ...gn and IP40 enclosure protection makes the product suitable for applications in harsh environments 1 2 FEATURES Unmanaged full SFP industrial switch 8 100Base FX SFP 2 1GBase FX SFP Dual 12 24VDC power input Level 3 ESD protection IP 40 housing design Operation temperature 40 75 Support DIN rail or wall mounted Unique DIN mount design makes mount and remove easy Installation Plug and play no setti...

Page 4: ...ut Power Dual DC inputs 12 24VDC 5 pin screw terminal Power Consumption Max 12W Overload Current Protection Present Reverse polarity protection Present Mechanical Enclosure IP40 Dimension W x D x H 68 mm W x 105 mm D x 146 mm H Weight 0 9Kg Environment Storage Temperature 40 to 85o C 40 to 185o F Operating Temperature 40 to 75o C 40 to 167o F Operating Humidity 5 to 95 Non condensing ...

Page 5: ...l view L N _ L N _ P1 P2 P1 P2 1 2 2 4 VD C 7 8 6 5 4 3 2 1 10 9 1G 1 2 3 4 5 1 12 24VDC power input 2 Grounding screw 3 PWR status indication 4 100M SFP ports 1 8 5 1G SFP ports 9 10 WARNING This product MUST be mounted to a well grounded mounting surface such as a metal panel Status indicator LED LED Color Status Description P1 Orange On Power 1 is being supplied ...

Page 6: ... www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 6 of 11 Off Power 1 is not being supplied P2 Orange On Power 2 is being supplied Off Power 2 is not being supplied SFP port LINK Green On The corresponding port s link is active ACT Blinking Data is being transmitted ...

Page 7: ...ESUMN8 P2 B Quick Start Guide ESUMN8 P2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 7 of 11 3 DIMENSIONS UNIT mm ...

Page 8: ... ESUMN8 P2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 8 of 11 4 MOUNTING 4 1 DIN mounting Very simple Press the clamp insert into rail then loosen hand 4 2 Wall mounting Step 1 Step 2 ...

Page 9: ...n to installing the equipment in an environment compatible with the maximum operating temperature specified by the manufacturer Air Flow Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised Circuit Overloading Consideration should be given to the connection of the equipment to the supply circuit and the e...

Page 10: ...uide ESUMN8 P2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 10 of 11 interference EMI Run the ground connection from ground screw to the grounding surface prior to connecting devices ...

Page 11: ...ports 100Mbps only and 1G SFP port supports 1Gbps only Need Help Please visit our website http www kbcnetworks com or contact your nearest KBC office or dealer KBC Networks Office Contact Information North Latin America USA Phone 1 949 297 4930 Toll free 1 888 366 4276 Email techsupport kbcnetworks com EMEA UK Phone 44 0 1322 312090 Email emeatechsupport kbcnetworks com APAC China Phone 1 86 25 58...

Reviews: