ESULS4-L1-B Quick Start Guide
ESULS4-L1-B Quick Start Guide-Rev1709.docx
www.
kbcnetworks
.com
Copyright © KBC Networks Ltd. 2017
Page
5
of
13
2
PANEL VIEWS
2.1
Front panel view
1
.
PWR status indication
2
.
45~57VDC power input
3
.
PoE status indication
4
.
Grounding screw.
5
.
10/100M Base-T port (PoE): #1 ~ #4
6
.
10/100M Base-T port: # 5
WARNING
:
This product MUST be mounted to a well-grounded mounting
surface such as a metal panel.
Status indicator LED
LED
Color
Status
Description
P1
Orange
On
Power is being supplied
Off
Power is not being supplied
P2
Orange
On
Power is being supplied