background image

 

 

 

Configuring the ESUL8-D* 

 

1.

Connect the DIN rail or wall-mount 
brackets as required. 

2.

Connect the 24Vdc power supply as 
follows: 

 

Contact number

 

DC connections 

 

AC connections 

 

PWR1: + 

PWR1:  L 

PWR1: - 

PWR1:  N 

Ground 

Ground 

PWR2: - 

PWR2:  L 

PWR2: + 

PWR2: N 

3.

Connect the ground connections as 
follows: 

 

4.

Link external devices to the switch with 
appropriate cables. 

LED 

Status 

Description 

 

PWR1 

 

ON 

Power is supplied to the unit 

  OFF 

No power to the unit 

PWR2 

  ON 

Power is supplied to the unit 

  OFF 

No power to the unit 

Ethernet RJ45 Port Status LED

 

Each RJ45 Ethernet port has two indicators, a yellow lamp 
and a green lamp. The yellow lamp indicates port speed, 
and the green lamp indicates port link state.

 

10/100 
(Yellow)

 

 

ON 

100M working status (100Base-
TX) 

 

OFF 

10M working status (10 Base-T) 
or no connection 

LINK/ACT 
(Green)

 

  ON 

Effective network connection 
has been established for the 
port 

  FLASH 

Data traffic is passing through 
the port 

  OFF 

No effective network connection 
has been established for the 
port 

 

Troubleshooting 

Visit our website 

http://www.kbcnetworks.com

 or 

contact your nearest KBC office or dealer: 

APAC: 

Phone: +65 9846 3323 
Email: 

[email protected]

 

 
EMEA: 

Phone: +44(0)1622 618787 
Email: 

[email protected]

 

 
USA: 

Phone:

 

+1 949 297 4930  

Toll Free: +1 888 366 4276

  

Email:

 

[email protected]

 

 

 

 

 

Quick Start Guide 

ESUL8-D*   

 

 

 

 

 

 

 

 

 

 

Industrial Ethernet Switch   

 

ESUL8-D* LED Status Indicators 

 

 

 

 

 

QSG-ESUL8-D-Rev1208

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

www.kbcnetworks.com

 

Copyright © KBC Networks Ltd. 2012  

Reviews: