background image

Quick Start Guide

ESUGS4-EG1-P1-D 

Industrial Ethernet Switch

Configuring the ESU

GS4-EG1-P1

-D 

1.

Connect the DIN rail or wall-mount 
brackets as required. 

2.

Connect a 48Vdc power supply, (supplied 
separately). 

3.

If using only one power source, connect 
pin 1 to pin 5 and pin 2 to pin 6 otherwise 
the Power Fail LED will be lit. 

4.

Link external devices to the switch with 
appropriate cables. 

5.

Connect the fault alarm contact 

ESUGS4-EG1-P1-D LED Status Indicators

LED

Status

Description

P1 

ON  Power is supplied to the unit 

OFF  No power to the unit 

P2 

ON  Power is supplied to the unit 

OFF  No power to the unit 

P-Fail 

ON  Power to input 1 or 2 has failed 

OFF  Power is functioning to both or 

none of the powered devices. 

PoE 1-4 

ON  The port is supplying power to 

the powered device 

OFF  There is no powered device 

attached or the power to the 

device has failed 

Ethernet RJ45 Port Status LED 

Each RJ45 Ethernet port has two indicators, a yellow 

lamp and a green lamp. The yellow lamp indicates port 

speed, and the green lamp indicates port link state. 

10/100 

(Yellow) 

ON  Full duplex link 

FLASH 

Collisions are occurring 

OFF  Half duplex link or no  

connection 

LINK/ACT 

(Green) 

ON 

Effective network connection 

has been established for the 
port 

FLASH  Data traffic is passing through 

the port 

OFF 

No effective network 

connection has been 

established for the port 

SFP Port Status LED 

6 LINK/ 
ACT 

ON  Link activity 

OFF  No link activity 

Need Help/Troubleshooting? 

Visit our website

 http://www.kbcnetworks.com

 or

contact your nearest KBC office or dealer: 

APAC: 

Phone: +86 25 588 21656 

Email: [email protected] 

EMEA: 

Phone: +44(0)1322 312090 

Email: [email protected] 

USA: 

Phone: +1 949-297-4930 
Toll Free: +1 888-366-4276 

Email: [email protected] 

QSG-ESUGS4-EG1-P1-D_Rev1710
Copyright © KBC Networks Ltd. 2017 

www.kbcnetworks.com

Reviews: