Quick Start Guide
ESUGS4-EG1-P1-D
Industrial Ethernet Switch
Configuring the ESU
GS4-EG1-P1
-D
1.
Connect the DIN rail or wall-mount
brackets as required.
2.
Connect a 48Vdc power supply, (supplied
separately).
3.
If using only one power source, connect
pin 1 to pin 5 and pin 2 to pin 6 otherwise
the Power Fail LED will be lit.
4.
Link external devices to the switch with
appropriate cables.
5.
Connect the fault alarm contact
ESUGS4-EG1-P1-D LED Status Indicators
LED
Status
Description
P1
ON Power is supplied to the unit
OFF No power to the unit
P2
ON Power is supplied to the unit
OFF No power to the unit
P-Fail
ON Power to input 1 or 2 has failed
OFF Power is functioning to both or
none of the powered devices.
PoE 1-4
ON The port is supplying power to
the powered device
OFF There is no powered device
attached or the power to the
device has failed
Ethernet RJ45 Port Status LED
Each RJ45 Ethernet port has two indicators, a yellow
lamp and a green lamp. The yellow lamp indicates port
speed, and the green lamp indicates port link state.
10/100
(Yellow)
ON Full duplex link
FLASH
Collisions are occurring
OFF Half duplex link or no
connection
LINK/ACT
(Green)
ON
Effective network connection
has been established for the
port
FLASH Data traffic is passing through
the port
OFF
No effective network
connection has been
established for the port
SFP Port Status LED
6 LINK/
ACT
ON Link activity
OFF No link activity
Need Help/Troubleshooting?
Visit our website
http://www.kbcnetworks.com
or
contact your nearest KBC office or dealer:
APAC:
Phone: +86 25 588 21656
Email: [email protected]
EMEA:
Phone: +44(0)1322 312090
Email: [email protected]
USA:
Phone: +1 949-297-4930
Toll Free: +1 888-366-4276
Email: [email protected]
QSG-ESUGS4-EG1-P1-D_Rev1710
Copyright © KBC Networks Ltd. 2017
www.kbcnetworks.com