background image

ESMPN8-N2-B Quick Start Guide 

ESMPN8-N2-B Quick Start Guide-Rev1709.docx 

 

www.

kbcnetworks

.com 

Copyright © KBC Networks Ltd. 2017

   

 

Page 

9

 of 

12

 

          

 

                      Step 3                                                            Step 4 

 
Step 1: Remove the guide rail fastener;   
Step 2: Remove the DIN clamp in the rear panel; 
Step 3: Find the wall mounting accessory, and loosen these 4 screws in the Switch. 
Step 4: Mounting the accessory on the rear panel; 
Step 5: Fixed the switch on the wall. 

4.3  Items for attention 

 

Operating Ambient:

 If the product is installed in a closed rack, the inside operating 

ambient  temperature  of  the  rack  may  be  higher  than  outside.  Therefore, 
consideration  should  be  given  to  installing  the  equipment  in  an  environment 
compatible with the maximum operating temperature specified by the manufacturer.   

 

Air Flow:

 Installation of the equipment in a rack should be such that the amount of 

air flow required for safe operation of the equipment is not compromised.   

 

Circuit  Overloading:

  Consideration  should  be  given  to  the  connection  of  the 

equipment to the supply circuit and the effect that overloading of the circuits might 
have on overcurrent protection and supply wiring.   

 

Reliable  Earthing:

  Reliable  earthing  of  rack-mounted  equipment  should  be 

maintained. Particular attention should be given to supply connections other than 
direct connections to the branch circuit (e.g. use of power strips). 

 

4.4  Grounding 

Grounding  and  wire  routing  help  limit  the  effects  of  noise  due  to  electromagnetic 

Summary of Contents for ESMPN8-N2-B

Page 1: ...ESMPN8 N2 B Quick Start Guide Rev 1709 ...

Page 2: ...BC Networks Ltd 2017 Page 2 of 12 Index 1 INTRODUCTION 3 1 1 ESMPN8 N2 B INTRODUCTION 3 1 2 FEATURES 3 1 3 SPECIFICATIONS 3 2 PANEL VIEWS 5 2 1 Front panel view 5 3 DIMENSIONS UNIT mm 7 4 MOUNTING 8 4 1 DIN mounting 8 4 2 Wall mounting 8 4 3 Items for attention 9 4 4 Grounding 9 5 Cable 11 5 1 SFP port 11 ...

Page 3: ...IP surveillance and industrial networks 1 2 FEATURES Managed industrial switch 8 1000Base FX SFP 2 10GBase FX SFP Support EPRS typical recovery time 30ms with 250 units of connection Support different redundancy protocols and standards STP RSTP MSTP Support SNMPv1 v2c v3 RMON Port base 802 1Q VLAN network management Support IGMP Snooping multicast function Support WEB Telnet SSH Console CLI Suppor...

Page 4: ...r Redundant Input Power Dual DC inputs 45 57VDC 5 pin screw terminal Power Consumption Max 30W Overload Current Protection Present Reverse polarity protection Present Mechanical Enclosure IP40 Dimension W x D x H 68 mm W x 105 mm D x 146 mm H Weight 0 9Kg Environment Storage Temperature 40 to 85o C 40 to 185o F Operating Temperature 40 to 75o C 40 to 167o F Operating Humidity 5 to 95 Non condensin...

Page 5: ...nel view 1 12 24VDC power input 2 Alarm output terminal block one is normal open and the other is normal close 3 USB console 4 Grounding screw 5 PWR RUN and Alarm status indication 6 1G SFP ports 1 8 7 10G SFP ports 9 10 WARNING This product MUST be mounted to a well grounded mounting surface such as a metal panel Status indicator LED LED Color Status Description ...

Page 6: ...un Green On System running lights the system normally solid green Alarm Green On Warning lamp P1 Orange On Power 1 is being supplied Off Power 1 is not being supplied P2 Orange On Power 2 is being supplied Off Power 2 is not being supplied SFP port LINK Green On The corresponding port s link is active ACT Blinking Data is being transmitted ...

Page 7: ...ESMPN8 N2 B Quick Start Guide ESMPN8 N2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 7 of 12 3 DIMENSIONS UNIT mm ...

Page 8: ... ESMPN8 N2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 8 of 12 4 MOUNTING 4 1 DIN mounting Very simple Press the clamp insert into rail then loosen hand 4 2 Wall mounting Step 1 Step 2 ...

Page 9: ...n to installing the equipment in an environment compatible with the maximum operating temperature specified by the manufacturer Air Flow Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised Circuit Overloading Consideration should be given to the connection of the equipment to the supply circuit and the e...

Page 10: ...uide ESMPN8 N2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 10 of 12 interference EMI Run the ground connection from ground screw to the grounding surface prior to connecting devices ...

Page 11: ...opyright KBC Networks Ltd 2017 Page 11 of 12 5 Cable 5 1 SFP port SFP port supports both electrical and optical SFP modules Selecting right SFP modules rate MM SM 1 fiber 2 fibers based on application Please notice that 1000M SFP port supports 1000Mbps only and 10G SFP port supports 10Gbps only ...

Page 12: ...ct your nearest KBC office or dealer KBC Networks Office Contact Information North Latin America USA Phone 1 949 297 4930 Toll free 1 888 366 4276 Email techsupport kbcnetworks com EMEA UK Phone 44 0 1322 312090 Email emeatechsupport kbcnetworks com APAC China Phone 1 86 25 5882 1665 Phone 2 86 25 5882 1656 Email techsupport kbcnetworks com Singapore Phone 65 9747 5123 Email apactechsupport kbcnet...

Reviews: