![KaZAM Trooper 2 6.0 User Manual Download Page 28](http://html1.mh-extra.com/html/kazam/trooper-2-6-0/trooper-2-6-0_user-manual_3739678028.webp)
Germany
Furthermore, the ISO requirement for the in-process quality control procedure as
well as the manufacturing process has been reached. The technical document as
well as the test reports will be kept for a period at least 10 years after the last
product has been manufactured at the disposal of the relevant national authorities
of any Member State for inspection.
Detail contact information for this declaration has been listed below as the window
of any issues relevant for this declaration.
Summary of Contents for Trooper 2 6.0
Page 1: ...USER MANUAL...