Install the outdoor unit
Install the drainpipe
L(L1) N(L2)
1
2
3
4
5
MC
MC
6
7
Install the indoor unit
Evacuate the refrigeration
system
Connect the wires
Connect the refrigerant
pipes
Perform a test run
Installation Summary
Ins
ta
llati
on Summa
ry
Page 1
8