CONTENTS
ACCESSORIES
................................................................................................................ 01
1 INTRODUCTION
• 1.1 use conditions of the unit ......................................................................................... 01
2 SAFETY CONSIDERATION
.................................................................................. 02
3 BEFORE INSTALLATION
• 3.1 Handling of the unit .................................................................................................. 04
4 IMPORTANT INFORMATION ON REFRIGERANT
.................................... 05
5 SELECTION OF INSTALLATION SITE
.......................................................... 05
6 PRECAUTIONS ON INSTALLATION
• 6.1 Outline dimensional drawing ................................................................................... 06
• 6.2 Requirements of arrangement space of the unit ..................................................... 07
• 6.3 Space requirements for parallel installation of multiple Modular units ...................... 08
• 6.4 Installation foundation .............................................................................................. 08
• 6.5 Installation of damping devices ................................................................................ 09
7 CONNECTION DRAWING OF PIPELINE SYSTEM
..................................10
8 OVERVIEW OF THE UNIT
• 8.1 Main parts of the uint ............................................................................................... 10
• 8.2 Opening the uint ...................................................................................................... 11
• 8.3 Outdoor unit PCBs ................................................................................................... 13
• 8.4 Electric wiring .......................................................................................................... 19
• 8.5 Water system installation .......................................................................................... 27
9 STRAT-UP AND CONFIGRUATION
................................................................. 31
10 TEST RUN AND FINAL CHECK
• 10.1 Check item table after installation .............................................................................32
• 10.2 Trial run .....................................................................................................................32
Summary of Contents for KEM-90
Page 52: ......