![Kaysun KEM-130 HN3 Technical Manual Download Page 75](http://html.mh-extra.com/html/kaysun/kem-130-hn3/kem-130-hn3_technical-manual_659089075.webp)
No
Model
Max unit combined
quantity
L(mm)
M(mm)
N(mm)
1
KEM-30 DHN3
16
≥
600
≥
300
≥
300
2
KEM-65 DHN3
16
≥
600
≥
300
≥
300
3
KEM-130 HN3
8
≥
600
≥
300
≥
300
4
KEM-200 HN3
5
≥
600
≥
300
≥
300
5
KEM-250 HN3
8
≥
600
≥
300
≥
300
11.1.3 Installation Foundation
n
The unit should be located on the horizontal foundation, the ground floor or the roof which can bear
operating weight of the unit and the weight of maintenance personnel. Refer to the operating weight
parameters in specification table.
n
If the unit is located so high that it is inconvenient for maintenance personnel to conduct maintenance,
the suitable scaffold can be provided around the unit.
n
The scaffold must be able to bear the weight of maintenance personnel and maintenance facilities.
n
The bottom frame of the unit is not allowed to be embedded into the concrete of installation foundation.
Location drawing of installation foundation of the unit
(unit: mm)
Summary of Contents for KEM-130 HN3
Page 2: ......
Page 5: ...2 1 2 External appearance KEM 130 HN3 KEM 200 HN3 KEM 250 HN3 KEM 30 DHN3 KEM 65 DHN3 ...
Page 33: ...30 130kW module ...
Page 35: ...32 250kW module ...
Page 39: ...36 200kW module ...
Page 73: ...130kW module 200kW module Input of airflow Input of airflow Input of airflow Input of airflow ...
Page 159: ......
Page 160: ......