EN - 6
(A) Guide the control lines through the line connectors on the left and right and tighten using a
loop, (B) put the lines around the deck fittings and (C) readjust using the line tensioner
(D) Feed the pulley rope through the line connector on the control blade and fasten it with a loop
Steering system - assembly of steering and pulley ropes
+
_
A
B
C
D
Summary of Contents for NATSEQ
Page 1: ......
Page 15: ...EN 14 My Notes...
Page 16: ...w w w k a y a k i n n o v a t i o n s c o m V04 MM...