Kawachi KW 25 Setup Manual Download Page 2

 Hardware List

 Bill Of Materials

Assembly Steps

BOLT(FH-11)M6X32

QTY-04 NOS

BOLT(FH-09)M6X38

QTY-10 NOS

STUD M6 & LOCKNUT (FH-04)

QTY-02 NOS

NUT (FH-10) M6

QTY-04 NOS

SCREW DRIVER (FH-07) 

QTY-01 NOS

SELF THREADING SCREW & WASHER M4(FH-08)

QTY-17 NOS

METAL FRAME 1

QTY-02 NOS

METAL FRAME 2

QTY-01 NOS

PLY 1(470X185X18MM)

QTY-03 NOS

PLY 2(470X115X18MM)

QTY-01 NOS

PLY 3(1200X520X18MM)

QTY-01 NOS

SQUARE TUBE 1(25X470MM)

QTY-02 NOS

SQUARE TUBE 2(25X900MM)

QTY-01 NOS

CROSS STRIP

QTY-02 NOS

Place two metal frame 1.
(Make sure that hole 
orientation should be 
same)

Assemble three ply 1 at 
Position by Aligning Holes 
to frame as shown 
(use Self  Threading Screw
(FH-08)-12 Nos.)

Assemble ply 2 at Position 
by Aligning Holes to frame 
as shown 
(use Self  Threading Screw
(FH-08)-04 Nos.)

Step 1 :

Step 2 :

Step 3 :

Assemble two Sq. tube 1 at Position by 
Aligning Holes to frame as shown.
(use- M6X38 Nut-bolt(FH-09)-04 Nos)

Assemble Sq. tube 2 at Position by 
Aligning Holes to Sq. tube 1 as shown.
(use- M6X38 Nut-bolt(FH-09)-01 Nos)

Step 4 :

Step 5 :

Reviews: